SpaceX Astronaut Mission Looking 'Increasingly Difficult' in 2019, Executive Says

SpaceX’s Crew Dragon was slated earlier this year to carry US astronauts to the ISS in a first manned test mission in July, although that date slipped until November.

Advertisement
By Reuters | Updated: 16 July 2019 11:22 IST

As Elon Musk's SpaceX closes in on the possible cause of a fiery explosion in April that destroyed one of its astronaut capsules, a company executive said on Monday its plan to launch humans into space this year looked "increasingly difficult."

One of the space company's Crew Dragon capsules exploded on a test stand at a Florida Air Force station moments before firing eight emergency abort thrusters designed to propel an on-board crew to safety in the event of a failure.

Advertisement

Crew Dragon was slated earlier this year to carry US astronauts to the International Space Station in a first manned test mission in July, although that date slipped until November following the explosion and some other hitches in the vehicle's design.

Monday's comments were a fresh sign that the schedule could slip into 2020.

"I'm pretty optimistic at this point in time because we have a good path forward," Hans Koenigsmann, SpaceX's vice president of Build & Flight Reliability told reporters on a conference call as the company provided fresh details from the investigation.

"But like I said, still not quite done. My emphasis is really on making sure this is safe ... By the end of this year, I don't think it's impossible, but it's getting increasingly difficult."

Advertisement

SpaceX said its accident investigation was pointing to a leaky valve as the likely cause of the April explosion.

NASA is paying SpaceX $2.6 billion and Boeing $4.2 billion to build rocket and capsule launch systems to return astronauts to the International Space Station from US soil for the first time since America's Space Shuttle programme went dark in 2011.

Advertisement

Koenigsmann, who sits on an investigative board convened by SpaceX just after the April explosion, said the probe is nearing completion and that the space company will need to make some changes to Crew Dragon's design before it can be trusted to send humans to space.

SpaceX said evidence shows that a leaking check valve allowed nitrogen tetroxide (NTO) to enter high-pressure helium tubes during the April test. "The failure of the titanium component in a high-pressure NTO environment was sufficient to cause ignition of the check valve and led to an explosion," SpaceX said on its website.

Advertisement

Steps were being taken to reduce such risks within the launch escape system, the company said. This includes replacing check valves, which typically allow liquid to flow in only one direction, with so-called burst disks that seal completely until opened by high pressure, it said.

© Thomson Reuters 2019

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: SpaceX, Crew Dragon
Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus 16 Software Testing Reportedly Begins; Could Launch In India Soon
  2. iQOO Neo 12 Launch Date, Colour Options Revealed
  3. Oppo F35 Pro 5G Review: An 8,000mAh Battery and a Lot to Like
  4. Samsung Galaxy F70 5G With a 5,000mAh Battery Debuts in India: See Price
  1. Cysic Shuts Down Bridge After Attacker Illegally Creates 10 Million CYS Tokens
  2. JPM Coin Arrives on Ethereum as JPMorgan Expands Institutional Payments
  3. Vivo V80 FE Reportedly Spotted on BIS Certification Website, India Launch Seems Imminent
  4. Airtel’s New Recharges in India Announced: Rs. 185, Rs. 203 and Rs. 206 Voice-Only Plans Details
  5. Vivo X500 Ultra Leak Reveals Launch Timeline, Chipset, Display and Key Specifications
  6. iQOO Neo 12 Launch Date Announced; Design, Colour Options Teased
  7. Qubic Halts Chain as Attacker Exploits Weak Seeds to Drain 1,400 Wallets
  8. iPhone Duo Battery Capacity Revealed Days Before Foldable Goes on Sale
  9. Poco X8s Gets Listed on Another Certification Website, Hinting at Imminent Launch
  10. Redmi Pad 3 Spotted on Multiple Certification Sites Ahead of Launch; Key Specifications Revealed
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.