ISRO Signs Contracts With 3 Vendors to Assemble 27 Satellites

Advertisement
By Press Trust of India | Updated: 19 July 2018 17:01 IST

The Indian Space Research Organisation has signed contracts with three vendors to outsource Spacecraft Assembly Integration and Testing (AIT) activities.

According to sources, vendors are expected to help ISRO assemble about 27 satellites over the next three years. As part of capacity-building activity, the UR Rao Satellite Centre (URSC) has taken up initiatives to promote participation of the Indian industry from spacecraft subsystems to spacecraft assembly, integration and testing, URSC said on its website.

Advertisement

In this context, it said, URSC-ISRO signed agreements yesterday to outsource of spacecraft assembly, integration and testing activities with multiple vendors - Alpha Technologies Private Limited, Bengaluru, and its consortium partners; Bharat Electronics Limited, Bengaluru, and Tata Advanced Systems Limited, Hyderabad.

URSC Director M Annadurai emphasised on the need for industry participation in satellite building activities, it said. Also, a technical presentation covering the scope of work, contract execution modality, was organised for the vendors.

Advertisement

Earlier this week, ISRO said it had successfully conducted a ground test of its high thrust version of the Vikas Engine that would improve the payload capability of the space agency's launch vehicles. The test for a duration of 195 seconds was conducted by scientists at the ISRO Propulsion Complex (IPRC) in Mahendragiri in Tirunelveli district of Tamil Nadu, the Indian Space Research Organisation said in an update on its website.

The Vikas Engine is the workhorse liquid rocket engine used to power the second stage of the ISRO's trusted Polar Satellite Launch Vehicle (PSLV). It is also used in the second stage and also at the four strap on stages of Geosynchronous Launch Vehicle (GSLV) and in the twin engine core liquid stage (L110) of GSLV Mk-III. "[..] a high thrust version of Vikas Engine was successfully qualified through a ground test for a duration of 195 seconds at the IPRC," the space agency said.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO
Advertisement

Related Stories

Popular Mobile Brands
  1. Asus ROG Strix Scar 18 (2026) With 240Hz 4K Screen Showcased at Computex
  2. Acer Unveils New Iconia Duo Tablets Ahead of Computex 2026
  3. Huawei Nova 16 Pro, Nova 16 Ultra Debut With 7,000mAh Battery: See Price
  4. Pawzeeble Is Building a Pet-Focused Social Networking Space for Indian Users
  5. Acer Predator Helios 18 AI (2026) Debuts With an Intel Core Ultra 9 CPU
  1. Asus ROG Edition 20 Lineup Unveiled at Computex 2026 to Commemorate 20 Years of ROG Series Products
  2. Indian Startup Pawzeeble Is Building a Pet-Focused Social Networking Space for Indian Users
  3. Asus ROG Strix Scar 18 (2026) With 240Hz 4K Mini-LED Display Showcased at Computex 2026
  4. Huawei Nova 16 Pro, Nova 16 Ultra Launched With Kirin 9010S SoC, 7,000mAh Battery: Price, Specifications
  5. Huawei Nova 16 Launched With 7,000mAh Battery, 50-Megapixel Camera, Nova 16z Tags Along: Price, Specifications
  6. Computex 2026: AMD Unveils Ryzen 7 7700X3D, Radeon RX 9070 GRE; Extends AM5 Support to 2029
  7. Itel Aqua Launched in India With IP67 Rating, 1,200mAh Battery: Price, Features
  8. Vivo X Fold 6 Launch Timeline Leaked; Tipped to Arrive With MediaTek Dimensity 9500 Chip
  9. HP OmniBook Ultra 16 (2026), OmniBook X 14 (2026) Unveiled With Nvidia's RTX Spark 'Superchip'
  10. Acer Swift Air 14 Launched With Intel Core Series 3 CPU, Lightweight Design at Computex 2026
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.