ISRO Starts Conducting Tests for Chandrayaan 2 Landing Mission

Advertisement
By Press Trust of India | Updated: 11 November 2016 19:13 IST

ISRO has started conducting tests for its ambitious Chandrayaan-2 mission at its facility in Challakere in Karnataka, where simulated lunar craters have been created for landing mission, ISRO Chairman AS Kiran Kumar said on Friday.

According to Kumar, several craters, resembling the terrain of the Moon, have been created on the ground at the facility to test instruments and sensors on the lander of Chandrayaan-2.

(Also see: India's Second Lunar Probe Chandrayaan-2 to Be Launched in 2017)

Advertisement

"We are doing some tests with regard to the Moon landing mission of Chandrayaan-2. For that, an aircraft carrying some of the instruments is being flown over this simulated area at our facility in Challakere," Kumar told reporters on the sidelines of a function held at Physical Research Laboratory (PRL) in Ahmedabad.

Advertisement

"We have created some craters there. These tests are part of our 'hazard avoidance and landing' exercise. The lander is supposed to come down and land (on the Moon). We have to make sure that it lands at a place which does not have too much of slope. Otherwise, one of the legs of the lander would stuck in a crater," Kumar said.

As per ISRO website, Chandrayaan-2, India's second mission to the Moon, is an advanced version of the previous Chandrayaan-1 mission. It consists of an orbiter, lander and rover configuration. The orbiter with scientific payloads will orbit around the Moon.

Advertisement

The lander will soft-land on the Moon at a specified site and deploy the rover. The scientific payloads onboard the orbiter, lander and rover are expected to perform mineralogical and elemental studies of the lunar surface.

In the recent past, Kumar had indicated that Chandrayaan-2 would be launched tentatively between 2017 and 2018.

Advertisement

"There will be instruments on the lander. To make sure that these instruments work when it lands on the Moon, we are doing some simulations and that is one of the activities going on at Challakere" Kumar, who also serves as the Secretary in the Department of Space and Chairman of Space Commission, said.

"Tests are also going on to check the engines which provide required thrust to the lander in order to bring down it's velocity to compensate the lunar gravity during the landing," Kumar added.

He was here to attend a function for giving away 'Shri Hari Om Ashram Prerit Dr. Vikram Sarabhai Research Awards-2015' and 'PRL Award-2015'.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. iQOO Z11 Turbo Design Teased; Specifications Leaked
  2. Oppo Reno 15 Pro Mini Confirmed to Launch in India Alongside These Models
  3. OnePlus Reportedly Developing New Smartphone for India, Global Markets
  4. OnePlus Pad Go 2 Review
  5. Oppo Reno 15 Series 5G Confirmed to Launch in India Soon
  6. Huawei Nova 15 Series With Kirin Chips, Up To 6,500mAh Batteries Launched
  7. Airtel-Perplexity Free Offer Now Requires a Card to Continue
  8. Asus VM670KA AiO All-in-One Desktop PC With 27-Inch Display Launched in India
  9. Oppo Find X9 Ultra Camera Specifications Leaked Ahead of China Launch
  10. Xiaomi Watch 5, Xiaomi Buds 6 to Launch Alongside Xiaomi 17 Ultra
  1. New Ionic Liquid Breaks Stability Barrier for Perovskite Solar Cells
  2. Yann LeCun Sets Up Advanced Machine Intelligence AI Startup After Announcing Departure From Meta
  3. Nayanam Now Available For Streaming Online: What You Need to Know About This Psychological Thriller Online
  4. Kaya-Chan Isn’t Scary OTT Release Details: Know Where to Watch This Anime Horror-Comedy Series Online
  5. Samsung Galaxy S25 Series Gets One UI 8.5 Beta 2 Update in India With New Improvements, Bug Fixes
  6. Oppo Pad Air 5 Display, Battery Upgrades Confirmed Ahead of December 25 Launch in China
  7. OpenAI Upgrades ChatGPT With Adjustable Personality Traits, Response Styles
  8. Huawei Nova 15 Ultra Launched With 6,500mAh Battery, Kirin 9010S Chip, Nova 15 Pro, Nova 15 Tag Along: Price, Features
  9. Huawei Watch 10th Anniversary Edition With 1.38-inch LTPO 2.0 AMOLED Screen, HarmonyOS 6 Launched: Price, Features
  10. OnePlus Phone Codenamed ‘Volkswagen’ With Snapdragon 8s Gen 4 Chip Tipped to Launch in India, Global Markets
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.