ISRO Starts Conducting Tests for Chandrayaan 2 Landing Mission

Advertisement
By Press Trust of India | Updated: 11 November 2016 19:13 IST

ISRO has started conducting tests for its ambitious Chandrayaan-2 mission at its facility in Challakere in Karnataka, where simulated lunar craters have been created for landing mission, ISRO Chairman AS Kiran Kumar said on Friday.

According to Kumar, several craters, resembling the terrain of the Moon, have been created on the ground at the facility to test instruments and sensors on the lander of Chandrayaan-2.

(Also see: India's Second Lunar Probe Chandrayaan-2 to Be Launched in 2017)

Advertisement

"We are doing some tests with regard to the Moon landing mission of Chandrayaan-2. For that, an aircraft carrying some of the instruments is being flown over this simulated area at our facility in Challakere," Kumar told reporters on the sidelines of a function held at Physical Research Laboratory (PRL) in Ahmedabad.

Advertisement

"We have created some craters there. These tests are part of our 'hazard avoidance and landing' exercise. The lander is supposed to come down and land (on the Moon). We have to make sure that it lands at a place which does not have too much of slope. Otherwise, one of the legs of the lander would stuck in a crater," Kumar said.

As per ISRO website, Chandrayaan-2, India's second mission to the Moon, is an advanced version of the previous Chandrayaan-1 mission. It consists of an orbiter, lander and rover configuration. The orbiter with scientific payloads will orbit around the Moon.

Advertisement

The lander will soft-land on the Moon at a specified site and deploy the rover. The scientific payloads onboard the orbiter, lander and rover are expected to perform mineralogical and elemental studies of the lunar surface.

In the recent past, Kumar had indicated that Chandrayaan-2 would be launched tentatively between 2017 and 2018.

Advertisement

"There will be instruments on the lander. To make sure that these instruments work when it lands on the Moon, we are doing some simulations and that is one of the activities going on at Challakere" Kumar, who also serves as the Secretary in the Department of Space and Chairman of Space Commission, said.

"Tests are also going on to check the engines which provide required thrust to the lander in order to bring down it's velocity to compensate the lunar gravity during the landing," Kumar added.

He was here to attend a function for giving away 'Shri Hari Om Ashram Prerit Dr. Vikram Sarabhai Research Awards-2015' and 'PRL Award-2015'.

 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Advertisement

Related Stories

Popular Mobile Brands
  1. iOS 26 Update Brings These New Features to AirPods Pro 3, Pro 2, AirPods 4
  2. iPhone 17 Pro Max Cosmic Orange Variant Out of Stock in the US, India: Report
  3. Samsung Galaxy Tab A11, Tab A11+ Design, Features Leaked Ahead of Launch
  4. Flipkart Big Billion Days Sale: Check Discounts on These Poco Smartphones
  5. iOS 26 Released Alongside iPadOS 26, macOS Tahoe: Here's How to Download It
  6. MediaTek Confirms Dimensity 9500 Launch Date; Timeline to Its First 2nm Chip
  1. Sony Said to Be Planning State of Play Broadcast for Next Week
  2. France Could Block Crypto Firms With MiCA Licenses Due to Enforcement Gap Concerns
  3. Oppo Find X9 Pro With Dimensity 9500 SoC Scores 4 Million Points on AnTuTu; Spotted on Geekbench
  4. Xiaomi 17 Pro Design Render Gives Us a Good Look at Its Leica-Branded Rear Cameras, Secondary Display
  5. Clair Obscur: Expedition 33 Has Sold 4.4 Million Copies in Less Than Six Months of Launch
  6. Materialists Now Streaming on Netflix: What You Need to Know About Dakota Johnson’s Starrer Movie
  7. The Trial Season 2 OTT Release Date: When and Where to Watch Kajol’s Legal Drama Series Online
  8. Ghaati OTT Release Reportedly Revealed Online: When and Where to Watch Anushka Shetty-Starrer Movie Online?
  9. American Express Launches NFT Passport Stamps to Commemorate Travel Memories
  10. Huawei Watch GT 6, GT 6 Pro Price, Specifications Leak Ahead of September 19 Launch: Report
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.