Isro's Mangalyaan Mars Orbiter Mission Set For Crucial Manoeuvre

Advertisement
By Press Trust of India | Updated: 22 September 2014 12:08 IST
Ahead of India's Mars orbiter's scheduled rendezvous with the red planet on September 24, Isro is all set for the crucial fourth trajectory correction manoeuvre and test fire of the main liquid engine on the spacecraft Monday.

The 440 Newton Liquid Apogee Motor (LAM) engine now in an idle mode on the Mars Orbiter Mission for 300 days will be fired for about four seconds which, if successful, will boost the confidence level of Isro about the success of insertion of the spacecraft into the Martian orbit.

"We are all set for the fourth trajectory correction manoeuvre and test fire of the main liquid engine, commands have already been loaded into the spacecraft for this event and has also been verified," a top ranking Isro official told PTI in Bangalore.

Advertisement

He said the event is crucial as the engine stored in the orbit for about 300 days without operation will be restarted for testing.

"This test firing of the LAM engine is like a trial, which is going to be fired for a longer duration on September 24 for Mars Orbit Insertion," he said. The engine will be test fired for 3.968 seconds with fuel consumption of about 0.567 kg and with a decremental velocity of 2.142 meters/second.

Advertisement

The MOM, India's first interplanetary mission launched on November 5, 2013 by India's workhorse Polar Satellite Launch Vehicle (PSLV) from the spaceport of Sriharikota in Andhra Pradesh, will enter into Sphere of Influence of Mars Monday.

On a 666 million km journey, the spacecraft escaped the earth gravity pull on December 1,2013

Advertisement

In case of any problem in Monday's manoeuvre, Isro said it is ready with Plan B where in eight thrusters alone will be firing for a longer duration, probably consuming more fuel, and try to get in orbit around Mars.

In a critical act in the final moments on September 24, the orbiter has to be slowed down from 22.1 km per second to 4.4 km per second in relation to the red planet to be captured by the Martian orbit for the mission to be declared a success.

Advertisement

The engine would be fired for 24 minutes on that day to reduce its velocity and insert it into the Martian orbit.

If the Rs. 450 crore MOM mission turns out to be a success, Isro would be the fourth space agency in the world to have sent a mission to Mars. European Space Agency (ESA) of European consortium, National Aeronautics and Space Administration (Nasa) of the US and Roscosmos of Russia are the only three agencies which have so far sent their missions to the red planet.

Only 21 of the total of 51 missions sent to Mars by various countries have been successful

If the final moments on September 24 are a success, India would be the first Asian country to go to Mars and also the first to succeed in the maiden attempt.

Isro would utilise four ground stations for the operation Indian Deep Space Network (IDSN) at Byalalu near Bangalore, Goldstone in USA, Madrid in Spain and Canberra in Australia.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Mangalyaan, Mars, Nasa
Advertisement

Related Stories

Popular Mobile Brands
  1. Samsung Galaxy S26 FE Will Go on Sale in India Soon, Microsites Confirm
  2. Boltt Ace 5G, Evo Software Support Confirmed Ahead of September 1 Sale
  3. Here's Why the Google Pixel 11 Series Will Not Get GrapheneOS
  4. PhonePe Launches UPI 123Pay for Feature Phones Across India
  5. Vivo T5 5G Key Specifications Confirmed Ahead of September 2 India Launch
  6. Redmi 17 5G Will Launch in India On This Date: See Colourways, Specs
  7. You Will Soon Be Able to Switch UPI AutoPay Mandates Across Platforms
  8. Ather Konarc Launched With Up to 200km Range, AEBS Braking and More
  9. Xiaomi 18 Fold Battery and Charging Details Leaked Ahead of Launch
  1. Boltt Reveals Software Update Policy for Ace 5G and Evo Ahead of September 1 Sale
  2. Samsung Galaxy Tab S12 Ultra Allegedly Listed on Geekbench With MediaTek Dimensity 9500 Chipset
  3. NPCI to Soon Allow Users to Port UPI AutoPay Mandates Across Digital Payments Platforms: Report
  4. PhonePe UPI 123Pay Enables UPI Payments Without Internet on Feature Phones in India
  5. Vivo T5 5G Key Specifications Teased; 7,050mAh Battery, Dual Rear Cameras Confirmed
  6. Anthropic’s Claude Closes 85 Percent of AI Safety Gap in Automated Research Test
  7. OpenClaw 2.0 Released as Biggest Update Since Launch; Brings Shared Cloud Sessions, Smarter Automations
  8. Samsung Galaxy S26 FE Set to Go on Sale in India Soon as Multiple Microsites Go Live
  9. Anthropic Faces Lawsuit From Sony Music, Warner Chappell Over Alleged Copyrighted Material Use
  10. Xiaomi Pad 9 Pro Could Get a Huge 11,000mAh Battery and Bigger 12.5-Inch Display, Leak Suggests
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.