Blue Ghost Lander Lowers Orbit, Prepares for Lunar Touchdown on March 2

Firefly Aerospace's Blue Ghost lander completes an orbit adjustment, bringing it closer to the lunar surface for landing.

Advertisement
Written by Gadgets 360 Staff | Updated: 20 February 2025 22:11 IST
Highlights
  • Blue Ghost lander lowers orbit to 120 km ahead of Moon landing
  • Firefly Aerospace confirms intermittent communication blackouts
  • NASA’s CLPS mission aims to study the Moon for future exploration

Blue Ghost Lander Lowers Orbit, Prepares for Lunar Touchdown on March 2

Photo Credit: Firefly Aerospace

Firefly Aerospace's Blue Ghost lander has successfully completed an engine burn to lower its orbit around the Moon, as part of its preparations for a scheduled lunar landing. The lander, which entered lunar orbit last week after a four-day journey from Earth, has now been positioned at an altitude of 120 kilometers above the surface. This adjustment, lasting three minutes and 18 seconds, has placed the spacecraft in a stable orbit ahead of its final descent. Data is currently being received while the mission team monitors the probe's positioning and upcoming maneuvers.

Orbital Adjustments and Communication Challenges

According to reports, the lander's orbit will be further refined before its anticipated landing on March 2. A video released by Firefly Aerospace has shown a closer view of the Moon's surface, with the company confirming that intermittent communication blackouts are expected as the spacecraft moves around the Moon's far side. While the probe remains on the near side, data transmission is ongoing, and mission controllers are finalising plans for the next set of orbital maneuvers.

Advertisement

Launch and Mission Objectives

Blue Ghost was launched aboard a SpaceX Falcon 9 rocket from NASA's Kennedy Space Center in Florida. The mission, part of NASA's Commercial Lunar Payload Services (CLPS) program, is designed to transport scientific experiments and technology demonstrations to the lunar surface. Ten payloads have been included in this mission, focusing on lunar surface studies and technological advancements to support future exploration.

Parallel Lunar Landing Efforts

The mission shared its launch with Japan-based ispace's lander, Resilience, which follows a different trajectory towards the Moon. Unlike Blue Ghost, which is set to land in a matter of days, Resilience's approach prioritises efficiency over speed and will take approximately 3.5 months to reach the lunar surface. Resilience carries a micro-rover named Tenacious and is attempting a soft landing after a previous unsuccessful attempt by the company.

Advertisement

Final Preparations for Lunar Surface Operations

If successful, Blue Ghost will become the second privately developed spacecraft to land on the Moon. Once on the surface, it will operate for approximately 14 Earth days, the duration of a full lunar day. During this period, scientific instruments will collect data, test components, and contribute to ongoing lunar research. As part of the Artemis program, these findings are expected to play a role in shaping future lunar exploration strategies.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Samsung Galaxy Unpacked Event Today: How to Watch Livestream
  2. OnePlus N6x Design, Colour Options Teased Ahead of India Launch
  3. These OnePlus Smartphones Could Receive the ColorOS 17 Update in India
  4. Redmi Note 17 Pro Max Listed on NBTC Website Ahead of Imminent Launch
  1. Vivo S2 India Launch Reportedly On the Horizon as Promotional Poster Leaks
  2. Samsung Galaxy Unpacked Event Today: How to Watch Galaxy Z Fold 8 Ultra, Galaxy Z Flip 8, Galaxy Watch 9 Launch Live
  3. Offline UPI Payments With NFC Support Could Launch in India Soon
  4. Samsung Galaxy S26 Ultra's Privacy Display Feature Gets a Major Upgrade in One UI 9 Beta
  5. OnePlus N6x Design, Colour Options Teased in New Marketing Material Ahead of Imminent Launch in India
  6. OnePlus 11, Nord 4, and Newer Models Tipped to Receive the Android 17-Based ColorOS 17 Update in India
  7. Redmi Note 17 Pro Max Appears on Thailand's NBTC Certification Database, Might Launch Soon
  8. Apple’s First Foldable iPhone Reportedly Appears in iOS 27 Beta Code With a Multi-Battery Setup
  9. X for Android App Undergoes Major Design Overhaul, Enhanced Performance and Reliability
  10. Samsung Galaxy Buds Able to Reportedly Skip Galaxy Unpacked Launch; Could Debut in October
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.