NASA Plans to Conduct Artemis 1 SLS Launch's Final Wet Dress Rehearsal in June

With June as the target for the next rehearsal, the launch of the Artemis 1 unnamed mission is expected to be pushed back again.

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 21 May 2022 17:29 IST
Highlights
  • SLS rocket will be brought to Kennedy Space Centre in Florida in June
  • On the first Artemis I SLS flight, NASA will not send astronauts
  • The agency first delayed the final tests scheduled for April 4

The SLS is designed to be the most powerful rocket ever built

Photo Credit: NASA

NASA is planning to make another attempt at testing the Artemis 1 SLS rocket in early June for the last time before launching it into space. The space agency said it will bring the Space Launch System (SLS) rocket and Orion spacecraft to the launchpad at the Kennedy Space Centre in Florida in early June for the next wet dress rehearsal attempt. A wet dress rehearsal involves following all the launch-day procedures, including loading the propellant, without actually launching the mission. This activity is aimed at finding any issues with the system and rectifying them in time for the actual launch.

With June as the target for the next test attempt, the launch of the Artemis 1 unnamed mission is expected to be pushed back again. The ambitious mission to send humans to the moon has faced several delays in its timeline. On the first flight, NASA will not send astronauts but the Orion spacecraft will fly around our closest celestial neighbour to study it.

Advertisement

NASA, in a blog post, said that its engineers have successfully addressed issues identified during previous rehearsal attempts of SLS, including the liquid hydrogen system leak. “Plans call for the next wet dress rehearsal to take place about 14 days after the rocket arrives at the pad,” it added. NASA officials said they are aiming for a launch window in August.

Previous attempts at conducting the wet dress rehearsal had to be either halted mid-way or delayed because of technical issues. The agency first delayed the final tests scheduled for April 4 after identifying issues with the helium check valve. A second attempt, on April 14, was prevented after a leak was discovered during liquid hydrogen loading operations. The rocket had to be rolled back to the vehicle assembly building for troubleshooting.

The SLS is designed to be the most powerful rocket ever built and it can carry more payload to deep space than any other vehicle. NASA plans to use it for human exploration of the moon and Mars, and send robotic missions to Saturn and Jupiter.


Are affordable smartwatches worth it? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. These Sony Signature Series Walkman Models Launch With Premium Design
  2. Oppo Find X10 Series to Debut in India With This Industry-First Camera Unit
  3. Microsoft Announces $50 Xbox Nano Controller, Launch Set for Next Month
  4. Samsung Galaxy F70 5G Will Launch in India on This Date
  5. Tecno Spark 50S 5G With a 6,500mAh Battery Debuts in India: See Price
  1. OpenAI AI Model Used Another Wallet’s Ethereum Testnet Funds Without Authorisation, Report Says
  2. Samsung Galaxy SmartTag 3 India Launch Timeline Confirmed by Company Executive
  3. CERT-in Issues Critical Warning After AI Agents Broke Into Indian Organisations' Live Systems
  4. Microsoft Announces $50 Xbox Nano Controller, Launch Set for Next Month
  5. Samsung Galaxy A38 5G Rear Camera Specifications Leaked; May Feature Same Sensors as Galaxy A37
  6. Meta’s Muse Spark Open Model Brings 1M-Token Context Window, Agentic AI Workflows to Apple Mac Studio
  7. Oppo Find X10 Pro Max Confirmed to Launch in India as First Phone With a Triple 200-Megapixel Camera System
  8. Ripple Partners With Cross River to Integrate RLUSD Into Core Banking Platforms
  9. Redmi K100 Officially Confirmed to Launch Later This Month; Pre-Orders Begin
  10. YouTube Music Will Now Display Labels for AI-Generated Music Integrated into the Player
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.