TRAI tightens norms for activation, de-activation of VAS services

Advertisement
By Press Trust of India | Updated: 11 July 2013 16:52 IST
Telecom operators have to take double confirmation from consumers before activating value added services (VAS) and must complete de-activation requests in four hours, sectoral regulator TRAI Wednesday said.

Activation of VAS by service providers has been a cause of customer complaints and was a major worry for TRAI as well.

Issuing new stringent guidelines for VAS, TRAI said: "The service provider has to provide a system which takes a second consent from the customer before providing a value added service through any means," the Telecom Regulatory Authority of India (TRAI) said in a statement.

Advertisement

As per TRAI, the operators can take the first consent of the consumer on their platform but for the second consent, a dedicated gateway, which is owned by a third party, has to be set up to take the final confirmation.

"The first offer of a service is on the service providers platform and a second confirmation from the customer is through a dedicated consent gateway which is owned by a third party and not by the service provider," TRAI said.

Advertisement

"It is only after receiving a second confirmation from the customer, that the service provider shall activate the value added service," it added.

TRAI said VAS activation procedure will include all forms of activation such as outbound dialling (OBD), SMS, Mobile Internet, interactive voice response system, tele-calling, unstructured supplementary services data (USSD) and any other mode of activation.

Advertisement

TRAI also mandated de-activation requests should be completed in four hours. The deactivation procedure should be publicised through advertisements in newspapers, updation on the website and SMSes.

The consumers can register complaints about wrongful activation of VAS on a toll-free common number, 155223.

Advertisement

"In case of wrong activation, the amount shall be refunded within 24 hours of the customer's request. Such customer requests should be within 24 hours for VAS with validity of more than one day and within 6 hours for VAS with validity of one day," TRAI said.

The guidelines also said 24 hours before auto renewals, customers should be provided the information through SMS and OBD before 24 hours.

"In case of USSD and SMS mode of activation, no activation response time should be greater than 10 seconds and 60 minutes respectively and in case of non-response, the same should be treated as no activation required," Trai said.

The Authority also said upon activation of VAS, the de-activation number, the validity of the VAS and charges for renewal should be explicitly informed.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: TRAI, telecom
Advertisement

Related Stories

Popular Mobile Brands
  1. Motorola Edge 2026 With 6.3-Inch Display Goes Official
  2. Realme P4R 5G India Launch Date, Design and Key Specifications Revealed
  3. Honor X7e With a 7,500mAh Battery Debuts Globally at This Price
  4. God of War Laufey Revealed at State of Play: Everything You Need to Know
  5. Lava Bold N2 5G Launched in India With 6,000mAh Battery, 6.75-Inch Display
  6. WhatsApp's Might Soon Flag Fraudulent Chats Before You Reply to Scammers
  7. Redmi Turbo 5 Tipped to Launch in India on This Date
  8.  Xiaomi 18, 18 Pro and 18 Pro Max Specifications Leaked Ahead of Debut
  9. Lumio Launches 55-Inch Variants of Vision 9 (2026), Vision 7 (2026) in India
  1. Meta Reportedly Testing ‘Series’ Feature to Organise Instagram, Facebook Reels Into Episodic Collections
  2. Xiaomi 18 Tipped to Sport 6.4-Inch Display; Pro Models Said to Feature Dual 200-Megapixel Rear Cameras
  3. Realme P4R 5G India Launch Date Revealed Along With Design and Key Specifications
  4. Marvel's Wolverine Gets Visceral Gameplay Trailer at State of Play, Pre-Orders Now Live
  5. RTX Spark Laptops Said to Cost More Than Traditional AI PCs; Base Models Could Start at $1,799
  6. Lumio Introduces 55-Inch Variants of Vision 9 (2026) and Vision 7 (2026) Smart TVs in India: Price, Features
  7. Bitcoin Drops Below $67,000 as ETF Outflows, Institutional Selling Intensify
  8. Lava Bold N2 5G Launched in India With 6,000mAh Battery, 6.75-Inch Display: Price, Specifications
  9. WhatsApp Said to Be Developing On-Device Scam Detection Feature for Android
  10. Motorola Edge 2026 Launched With 6.3-Inch Display, MediaTek Dimensity 7450 SoC: Price, Specifications
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.