ISRO Successfully Completes Third Orbit-Raising Manoeuvre for Chandrayaan-3 Spacecraft

ISRO successfully launched its Chandrayaan-3 mission to the Moon on July 14.

Advertisement
By Press Trust of India | Updated: 18 July 2023 17:22 IST
Highlights
  • Chandrayaan-3 is the ISRO's follow-up attempt after the Chandrayaan-2
  • Last week, Chandrayaan-3 was launched on GSLV Mark 3 (LVM 3)
  • Upon landing, it will operate for one lunar day

The next firing for Chandrayaan-3 is planned for July 20 between 2 pm and 3 pm

Photo Credit: Reuters

The Indian Space Research Organisation (ISRO) on Tuesday successfully performed the third orbit-raising manoeuvre (Earth-bound perigee firing) of the Chandrayaan-3 spacecraft.
The next firing is planned for July 20 between 2 pm and 3 pm, the national space agency headquartered here said.

"The third orbit-raising manoeuvre (Earth-bound perigee firing) is performed successfully from ISTRAC (ISRO Telemetry, Tracking and Command Network)/ISRO, Bengaluru," it said.

The Chandrayaan-3 mission to the Moon was launched on July 14.

Advertisement

After the successful launch of Chandrayaan-3 on GSLV Mark 3 (LVM 3) heavy-lift launch vehicle last week, Director of Indian Space Research Organisation (ISRO) S Somanath said that landing is one important step for further exploration.

Advertisement

"Chandrayaan-3 is a very important step...Landing this time is very important. Unless you land, you cannot take samples, you cannot land human beings, and you cannot create moon bases. So, landing is one important step for further exploration," said ISRO chief S Somanath.

Chandrayaan-3 is the ISRO's follow-up attempt after the Chandrayaan-2 mission faced challenges during its soft landing on the lunar surface in 2019 and was eventually deemed to have failed its core mission objectives.

Advertisement

Last week, Chandrayaan-3 was launched on GSLV Mark 3 (LVM 3) heavy-lift launch vehicle successfully from the Satish Dhawan Space Centre in Andhra Pradesh's Sriharikota as per the scheduled launch time.

The journey from Earth to the moon for the spacecraft is estimated to take about a month and the landing is expected on August 23. Upon landing, it will operate for one lunar day, which is approximately 14 Earth days. One day on the Moon is equal to 14 days on Earth.

Advertisement

Chandrayaan-3, India's third lunar exploration mission, will make India the fourth country after US, China, and Russia, to land its spacecraft on the surface of the moon and demonstrate the country's abilities for safe and soft landing on the lunar surface. 


Will the Nothing Phone 2 serve as the successor to the Phone 1, or will the two co-exist? We discuss the company's recently launched handset and more on the latest episode of Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Chandrayaan-3, Chandrayaan-2
Advertisement

Related Stories

Popular Mobile Brands
  1. Vivo X300 FE Reportedly Bags IMDA and TUV Certifications Ahead of Launch
  2. Samsung Galaxy S26+ Reportedly Listed for Sale Online Ahead of Launch
  3. AMD and TCS Partner on Rack-Scale AI and HPC Infrastructure
  4. Oppo Find X10 Series Could Debut This Year With This iPhone-Like Feature
  5. PS6 Could Reportedly be Delayed to 2029 Due to RAM Shortage
  6. Lava Bold N2 Will Be Launched in India on This Date: See Expected Specs
  7. Oppo K14x 5G With 6,500mAh Battery Goes on Sale in India: See Price, Offers
  8. Xiaomi 17 Series Leak Hints at Imminent Launch Ahead of MWC at These Prices
  9. Anthropic's First Indian Office in Bengaluru Is Now Open
  1. Sony Could Reportedly Delay PS6 to as Late as 2029 Due to RAM Shortage
  2. iPhone 18 Series to Drop SIM Card Slot in Europe to Make Room for Slightly Larger Battery: Report
  3. Poco X8 Pro Spotted on Geekbench With MediaTek Dimensity 8500 Ultra SoC, Android 16
  4. Xiaomi 17, Xiaomi 17 Ultra Global Price Details, Launch Date and Colour Options Leaked
  5. X Building Smart 'Cashtags' to Let Users Check Cryptocurrency Prices in Real-Time
  6. Samsung Galaxy A27 5G Listing on IMEI Database Suggests a Galaxy A26 Successor Is on the Way
  7. Anthropic Inaugurates First Indian Office in Bengaluru, Starts Hiring Local Talent
  8. Apple Tipped to Adopt Samsung's Privacy Display Technology for MacBook Models by 2029
  9. Oppo Find X10 Series Tipped to Launch in H2 2026 With Built-In Magnets for Wireless Charging
  10. AMD and TCS to Co-Develop Helios AI Data Centre Architecture, Deliver 200MW Data Centre Blueprint
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.