ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade

ISRO completed the third hot test of its SE2000 engine, advancing plans to upgrade the LVM3 rocket for higher payloads and future space missions by 2027.

Advertisement
Written by Gadgets 360 Staff | Updated: 3 June 2025 20:37 IST
Highlights
  • Third hot test validates SE2000 engine startup sequence
  • SE2000 boosts LVM3 payloads to GTO and LEO by 25%
  • ISRO eyes 2027 debut of enhanced LVM3 for lunar missions

ISRO completed the third hot test of its SE2000 engine

Photo Credit: ISRO

The Indian Space Research Organisation (ISRO) successfully carried out the third hot test of its semi-cryogenic engine Power Head Test Article (PHTA) on 28 May 2025 at the ISRO Propulsion Complex (IPRC), Mahendragiri. The test is part of a series of performance evaluations aimed at validating key subsystems of the 2000 kN-class SE2000 engine that will eventually power the SC120 propulsion stage intended to replace the existing L110 liquid core stage of the LVM3 launch vehicle. ISRO began this series of performance evaluations in March 2025, focusing on critical components such as low- and high-pressure turbo-pumps, the pre-burner, the start-up system, and various control mechanisms.

The three-phased trials

According to the official ISRO press release, the PHTA has undergone two hot tests earlier, which included all systems except the thrust chamber. The first test on 28.03.2025 demonstrated the smooth ignition & bootstrap operation over a short duration of 2.5 seconds. The second hot test on 24.04.2025 demonstrated the start transient build-up and tested the start-up sequence by carrying out a hot-firing for a duration of 3.5 seconds. The third test was carried out for a duration of 3 seconds to fine-tune further & finalize the start-up sequence.

Advertisement

The SE2000 employs an oxidizer-rich staged combustion cycle using liquid oxygen and kerosene. It is able to deliver a chamber pressure of 180 bar and a specific impulse of 335 seconds—an upgrade over the L110 stage's hydrazine-based propulsion.

Future Integration and Impact on Indian Launch Capability

With the subsystem validations complete, ISRO will now begin integrated engine-level trials, moving toward full operational readiness. The SC120 stage powered by SE2000 is expected to increase LVM3's payload capacity from 4 to 5 tonnes to Geostationary Transfer Orbit (GTO) and from 8 to 10 tonnes to Low Earth Orbit (LEO).

 

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Smartphones Launching in September 2026: iPhone 18 Pro, iPhone Ultra, Poco F9 Series,More
  2. Smartphones Launched in India (August 2026): See List
  3. Apple Could Make Its Next Apple Watch a Much Better Health Tracker
  1. Poco F9 Ultra May Cost Nearly Twice as Much as Poco F9 Pro, Tipster Claims
  2. Apple Watch Series 12, Ultra 4 Could Get Two Major Health Upgrades, New Finishes: Report
  3. Vivo X500 Pro Max Display Details Officially Teased Ahead of Launch
  4. Apple Maps Gets Transit Support in India With Public Transport Directions and More
  5. Google Is Changing How You Sign In to Android Apps
  6. Sneaky Sasquatch Gets Subway Surfers+ Crossover, Birdwatching Update on Apple Arcade
  7. YouTube Adds Amazon Product Tags to Shorts, Videos and Livestreams
  8. Poco X8 5G and X8 Power 5G India Launch Date Set for September 4
  9. Acer Swift Neo 14 Refreshed in India With Up to Intel Core Ultra 7 CPU: Price, Features
  10. Samsung Odyssey G Series Gaming Monitors Unveiled at Gamescom 2026 With Curved OLED, 1,100Hz Panel
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.