ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade

ISRO completed the third hot test of its SE2000 engine, advancing plans to upgrade the LVM3 rocket for higher payloads and future space missions by 2027.

Advertisement
Written by Gadgets 360 Staff | Updated: 3 June 2025 20:37 IST
Highlights
  • Third hot test validates SE2000 engine startup sequence
  • SE2000 boosts LVM3 payloads to GTO and LEO by 25%
  • ISRO eyes 2027 debut of enhanced LVM3 for lunar missions

ISRO completed the third hot test of its SE2000 engine

Photo Credit: ISRO

The Indian Space Research Organisation (ISRO) successfully carried out the third hot test of its semi-cryogenic engine Power Head Test Article (PHTA) on 28 May 2025 at the ISRO Propulsion Complex (IPRC), Mahendragiri. The test is part of a series of performance evaluations aimed at validating key subsystems of the 2000 kN-class SE2000 engine that will eventually power the SC120 propulsion stage intended to replace the existing L110 liquid core stage of the LVM3 launch vehicle. ISRO began this series of performance evaluations in March 2025, focusing on critical components such as low- and high-pressure turbo-pumps, the pre-burner, the start-up system, and various control mechanisms.

The three-phased trials

According to the official ISRO press release, the PHTA has undergone two hot tests earlier, which included all systems except the thrust chamber. The first test on 28.03.2025 demonstrated the smooth ignition & bootstrap operation over a short duration of 2.5 seconds. The second hot test on 24.04.2025 demonstrated the start transient build-up and tested the start-up sequence by carrying out a hot-firing for a duration of 3.5 seconds. The third test was carried out for a duration of 3 seconds to fine-tune further & finalize the start-up sequence.

Advertisement

The SE2000 employs an oxidizer-rich staged combustion cycle using liquid oxygen and kerosene. It is able to deliver a chamber pressure of 180 bar and a specific impulse of 335 seconds—an upgrade over the L110 stage's hydrazine-based propulsion.

Future Integration and Impact on Indian Launch Capability

With the subsystem validations complete, ISRO will now begin integrated engine-level trials, moving toward full operational readiness. The SC120 stage powered by SE2000 is expected to increase LVM3's payload capacity from 4 to 5 tonnes to Geostationary Transfer Orbit (GTO) and from 8 to 10 tonnes to Low Earth Orbit (LEO).

 

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Rise of the Ronin, Dying Light and More Join PS Plus Game Catalogue in July
  2. Apple Back to School Sale: Grab These Deals on MacBook, iPad Models
  3. Infinix Note 60 Pro Pininfarina Edition First Impressions
  4. Oppo, OnePlus Could Equip New Phones With a 10,000mAh Battery
  1. Google Rebrands NotebookLM as Gemini Notebook; Brings Cloud Computing and Search Integration
  2. Samsung Music Studio 5, Music Studio 7 Wi-Fi Speakers Launched in India
  3. Ostium Suspends Trading Following Oracle Security Incident Drains Millions
  4. Oppo’s New A Series, Upcoming OnePlus Mid-Range Smartphones Tipped to Launch With 10,000mAh Batteries
  5. WhatsApp Reportedly Rolls Out Mic Mode Controls for iPhone Calls
  6. Former Rockstar Games Developer Explains Why GTA 6 Maker Launches Games on PC After Consoles
  7. Samsung Galaxy Tab S12 Ultra CAD Renders Leaked Online; Reveals Familiar Look
  8. Apple Back to School Sale Now Live in India, Bringing Offers on MacBook Air, iPad Pro and More
  9. Realme Could Replace Realme UI With ColorOS 17 in India: Report
  10. Nubia NaviX Ultra Design, Colour Options Unveiled Ahead of July 17 Launch
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.