ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade

ISRO completed the third hot test of its SE2000 engine, advancing plans to upgrade the LVM3 rocket for higher payloads and future space missions by 2027.

Facebook Gadgets360 Twitter Share Tweet Snapchat LinkedIn Reddit Comment google-newsGoogle News
ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade

Photo Credit: ISRO

ISRO completed the third hot test of its SE2000 engine

Highlights
  • Third hot test validates SE2000 engine startup sequence
  • SE2000 boosts LVM3 payloads to GTO and LEO by 25%
  • ISRO eyes 2027 debut of enhanced LVM3 for lunar missions
Advertisement

The Indian Space Research Organisation (ISRO) successfully carried out the third hot test of its semi-cryogenic engine Power Head Test Article (PHTA) on 28 May 2025 at the ISRO Propulsion Complex (IPRC), Mahendragiri. The test is part of a series of performance evaluations aimed at validating key subsystems of the 2000 kN-class SE2000 engine that will eventually power the SC120 propulsion stage intended to replace the existing L110 liquid core stage of the LVM3 launch vehicle. ISRO began this series of performance evaluations in March 2025, focusing on critical components such as low- and high-pressure turbo-pumps, the pre-burner, the start-up system, and various control mechanisms.

The three-phased trials

According to the official ISRO press release, the PHTA has undergone two hot tests earlier, which included all systems except the thrust chamber. The first test on 28.03.2025 demonstrated the smooth ignition & bootstrap operation over a short duration of 2.5 seconds. The second hot test on 24.04.2025 demonstrated the start transient build-up and tested the start-up sequence by carrying out a hot-firing for a duration of 3.5 seconds. The third test was carried out for a duration of 3 seconds to fine-tune further & finalize the start-up sequence.

The SE2000 employs an oxidizer-rich staged combustion cycle using liquid oxygen and kerosene. It is able to deliver a chamber pressure of 180 bar and a specific impulse of 335 seconds—an upgrade over the L110 stage's hydrazine-based propulsion.

Future Integration and Impact on Indian Launch Capability

With the subsystem validations complete, ISRO will now begin integrated engine-level trials, moving toward full operational readiness. The SC120 stage powered by SE2000 is expected to increase LVM3's payload capacity from 4 to 5 tonnes to Geostationary Transfer Orbit (GTO) and from 8 to 10 tonnes to Low Earth Orbit (LEO).

Play Video

 

Comments

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Gadgets 360 Staff
The resident bot. If you email me, a human will respond. More... more  »
Vivo Y19s Pro With 6,000mAh Battery, 50-Megapixel Rear Camera Launched: Price, Features
OnePlus Ace 6, OnePlus Ace 6 Pro Tipped to Debut With Snapdragon 8 Series Chips

Advertisement

Follow Us

Advertisement

© Copyright Red Pixels Ventures Limited 2025. All rights reserved.
Trending Products »
Latest Tech News »