NASA Pushes Back Perseverance Rover Timeline to Bring Back Mars Rock Samples to 2033

NASA’s Perseverance rover is working on the Jezero Crater as scientists believe it harboured a lake and a river delta billions of years ago

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 29 March 2022 14:49 IST
Highlights
  • NASA's Perseverance rover is working on the 45-km-wide Jezero Crater
  • The Earth-return orbiter launch has also been delayed from 2026 to 2027
  • NASA's rover is collecting rock samples for signs of ancient life

NASA's Mars 2020 Perseverance rover is used to collect rock and soil samples from Mars

Photo Credit: Twitter/ @NASA

The hunt to find signs of ancient life on Mars involves bringing back rock samples from the Red Planet — these are currently being collected by NASA's Perseverance rover on the 45-km-wide Jezero Crater. The initial plan was to send a sample-return lander (SRL) by 2026 and get back the samples by 2031. But that timeline appears to have been pushed back. NASA has announced that the plan would now include an additional lander because of which the SRL launch date has been pushed back to 2028 and the sample return to 2033.

Perseverance is working on the Jezero Crater as scientists believe it harboured a lake and a river delta billions of years ago. The rover is scratching beneath the surface to collect samples so that when they are brought back to Earth, scientists could have a closer look to figure out whether they hold any signs of ancient life.

Advertisement

The mission was complex. For the 2026 launch plan, SRL was to carry a NASA Mars ascent vehicle (MAV) and an ESA-built fetch rover. The fetch rover was to pick the sample container from Perseverance and bring it to the MAV. The MAV would then have launched into Martian orbit with the samples. Then, an ESA-built Earth-return Orbiter to collect the samples from MAV and bring it back to Earth by 2031.

But NASA is now planning to use a dual-lander architecture.

Advertisement

“The development of a second lander necessitates a move to a 2028 launch date and 2033 sample return date and is consistent with the Mars Sample Return Independent Review Board's finding that a dual-lander architecture may improve the probability of mission success,” stated NASA officials in a budget request proposal

Consequently, the launch of the Earth-return orbiter has also been delayed, from 2026 to 2027.

Advertisement

This is not the only mission that NASA has delayed. Its other ambitious plan — Artemis I— to return humans to the Moon has also been pushed back several times. Artemis I was originally scheduled to launch in November last year, but after several delays, NASA has said it is targeting summer this year for launching the first of the several Artemis flights.


Will the 2022 iPhone SE sink or swim? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. These OnePlus Smartphones Could Receive the ColorOS 17 Update in India
  2. iOS 27 Beta Code Reportedly Reveals a Key Detail About the Foldable iPhone
  3. Samsung Galaxy S26 FE, Galaxy Tab S12 Reportedly Appear in Google App
  4. Redmi Note 17 Pro Max Listed on NBTC Website Ahead of Imminent Launch
  1. Offline UPI Payments With NFC Support Could Launch in India Soon
  2. Samsung Galaxy S26 Ultra's Privacy Display Feature Gets a Major Upgrade in One UI 9 Beta
  3. OnePlus N6x Design, Colour Options Teased in New Marketing Material Ahead of Imminent Launch in India
  4. OnePlus 11, Nord 4, and Newer Models Tipped to Receive the Android 17-Based ColorOS 17 Update in India
  5. Redmi Note 17 Pro Max Appears on Thailand's NBTC Certification Database, Might Launch Soon
  6. Apple’s First Foldable iPhone Reportedly Appears in iOS 27 Beta Code With a Multi-Battery Setup
  7. X for Android App Undergoes Major Design Overhaul, Enhanced Performance and Reliability
  8. Samsung Galaxy Buds Able to Reportedly Skip Galaxy Unpacked Launch; Could Debut in October
  9. Dell Alienware 16X Aurora, Alienware 16 Area-51 and Alienware 18 Area-51 Launched in India: Price, Specifications
  10. Samsung Galaxy A55, Galaxy A35 One UI 9 Test Builds Reportedly Spotted Ahead of Android 17 Rollout
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.