Chandrayaan-2 Mission Launch Called Off Due to Technical Snag in the Rocket

ISRO will announce a revised date later.

Advertisement
By Press Trust of India | Updated: 15 July 2019 09:43 IST

Less than an hour before liftoff, India's second mission to Moon, Chandrayaan-2 onboard GSLVMkIII-M1 was Monday called off due to a technical snag, the Indian Space Research Organisation (ISRO) said.

The countdown to the launch scheduled for 2:51 am was stopped 56 minutes and 24 seconds before liftoff at 1:55 am following the announcement from the Mission Control Centre.

Advertisement

Confusion prevailed for several minutes before ISRO came out with an official confirmation about the launch being cancelled.

"A technical snag was observed in the launch vehicle system at t-minus 56 minutes. As a measure of abundant precaution Chandrayaan 2 launch has been called off for today," ISRO Associate Director (Public Relations), B R Guruprasad said.

"Revised launch date will be announced later," he added.

Another ISRO official said: "Launch is called off due to technical snag. It is not possible to make the launch within the (launch) window. (A new) launch schedule will be announced later."

Advertisement

The space agency had earlier scheduled the launch in the first week of January but shifted it to July 15.
The lift-off of the three-component spacecraft weighing 3,850 kg and comprising an orbiter, the lander and the rover was scheduled from the Satish Dhawan Space Centre (SDSC) here.

President Ram Nath Kovind was in Sriharikota to witness the launch.

Advertisement

The Chandrayaan-2 was supposed to explore the uncharted lunar south pole, 11 years after ISRO''s successful first lunar mission - Chandrayaan-1, which made more than 3,400 orbits around the moon and was operational for 312 days till August 29, 2009.

The Rs. 978 crore Chandrayaan-2 onboard the heavy-lift rocket Geosynchronous Launch Vehicle GSLV-MkIII-M1, nicknamed Baahubali, would have taken 54 days to accomplish the task of landing on the Moon through meticulously planned orbital phases.

Advertisement

After a full dress rehearsal last week, the countdown for the mission commenced at 6:51 am on Sunday and scientists had undergone various stages of propellant filling to power the rocket ahead of the launch.

Billed as the most complex and prestigious mission ever undertaken by the ISRO since its inception, Chandrayaan-2 would make India the fourth country to soft-land a rover on the lunar surface after Russia, the United States and China.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Chandrayaan-2
Advertisement

Related Stories

Popular Mobile Brands
  1. Oppo Find X10 Pro Max Will Launch in India With This Flagship MediaTek SoC
  2. Infinix Note Edge JBL Edition First Impressions
  3. Realme C01 Price, Specifications Revealed via Retailer Listing
  1. GTA 6 Is Estimated to Have Generated $630 Million From Pre-Orders Already
  2. Infinix GT 50 Pro Gaming Bundle Revealed Ahead of October 27 India Launch
  3. Malaysia Rolls Out Tokenised Bond Platform for Around-the-Clock Settlement
  4. SBI Reports Suspected Data Exposure Affecting 3,897 Customer Records
  5. eMudhra Takes Remedial Action After Security Researcher Flags Weak Intermediate CA Keys
  6. Upbit Operator Dunamu Partners With MoonPay to Advance Stablecoin Payment Solutions
  7. Perplexity Computer for Mac Adds Local AI Mode for Pro, Max Subscribers
  8. Oppo Reno 17 Pro Camera, Display and Battery Specifications Surface Online Ahead of Expected Launch
  9. Motorola Razr Flex 27 Chipset and Other Specifications Revealed via Geekbench Listing Ahead of Launch
  10. Qubic Brings Blockchain Back Online After $1.4 Million Attack, Sets Recovery Claim Window
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.