NASA Encounters Problem During Artemis I Wet Dress Rehearsal, Delays Test

NASA's wet dress rehearsal for the Artemis 1 uncrewed test flight had begun on Friday at the Kennedy Space Center and was due to complete by Sunday.

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 4 April 2022 13:22 IST
Highlights
  • NASA's Artemis 1 uncrewed test flight is planned for June
  • It will involve the Space Launch System mega rocket and Orion MPCV
  • NASA had to scrub the wet dress rehearsal due to issues

A wet dress rehearsal before the Space Launch System (SLS) rocket was okayed for Artemis 1 began Friday.

Photo Credit: Twitter/ NASA

NASA has yet again delayed the final major test of its Space Launch System (SLS), which will be used to carry humans to the Moon, initially, and then to Mars and beyond. The agency announced it has suspended the “wet dress rehearsal” after issues with maintaining the pressure in the mobile launcher — which provides support for the rocket up until launch — prevented technicians from safely loading propellants into the rocket. Lightning strikes were also reported on Saturday. Engineers have been working to address the issues and NASA has updated that it is targeting to resume the final test before the Artemis I uncrewed mission on Monday.

The wet dress rehearsal before the mega 322-foot Space Launch System (SLS) rocket was okayed for flying had begun Friday at the Kennedy Space Center and it was set to complete by Sunday. However, some fans on the mobile launcher failed to maintain positive pressure within the enclosed areas. This pressure is needed to keep out hazardous gases. As a result, NASA engineers couldn't “safely proceed” with the fuel-loading process, the agency said, adding that they are exploring the next opportunity to load the fuel on Monday (April 4).

“Teams have decided to scrub tanking operations for the wet dress rehearsal due to loss of ability to pressurise the mobile launcher,” NASA stated in a blog post.

Advertisement

A wet dress rehearsal involves going through all procedures, including loading hundreds of thousands of gallons of fuel into the rocket, except for launching it. On Saturday night, while the tests were on, NASA encountered some rough weather as lightning struck the lightning towers around the mega rocket's launchpad. NASA stated that there were four lightning strikes, including one higher in intensity.

Advertisement

The SLS, comprising the super heavy-lift expendable launch vehicle and the Orion spacecraft, is expected to launch on the initial uncrewed mission this summer - Artemis 1. After that, it will carry astronauts to the Moon, the first time in more than three decades. NASA intends to use the SLS for future human Mars missions under the Artemis programme.

 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Further reading: Artemis I, NASA, Moon mission, Artemis, SLS
Advertisement

Related Stories

Popular Mobile Brands
  1. Amazon Sale 2025: OnePlus 13s, OnePlus Nord 5 Deals Revealed
  2. iPhone 16 Pro, iPhone 16 Pro Max Offers Listed Ahead of Flipkart Sale
  3. OnePlus 13 Gets Big Price Cut at Amazon Great Indian Festival Sale
  4. Instamart Sale: iPhone 16, OnePlus 13R at Jaw-Dropping Prices
  5. Vivo V60e Price in India, Specifications Surface Ahead of Launch
  1. Oakley Meta Vanguard Smart Glasses With a Centrally-Placed Camera Launched, Aimed at Athletes
  2. Ray-Ban Meta Gen 2 Smart Glasses Launched With 2X Battery Life, 3K Ultra HD Camera
  3. Meta Ray-Ban Display Smart Glasses Launched With AR Screen and Meta Neural Band
  4. NASA’s Artemis Prepares Crews for Future Mars Missions
  5. JWST Identifies Compact, Metal-Poor Star-Forming Region Tracing Back to Early Universe
  6. Researchers Develop Method to Predict Rare Green Auroral Events on Mars
  7. Kanyakumari Now Streaming on This OTT Platform: Know Everything About This Telugu Romance Drama
  8. Demon Slayer: Infinity Castle OTT Release: Know When and Where to Watch it Online?
  9. Xbox Game Pass Wave 2 Titles for September Include RoadCraft, Frostpunk 2 and Hades
  10. Government Makes Cybersecurity Audits Mandatory for Crypto Exchanges Due to Rising Risks
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.