Google Data Centre to Rise in Former Power Plant

Advertisement
By Agence France-Presse | Updated: 25 June 2015 09:33 IST
Google on Wednesday announced it will convert a former coal-burning power plant in Alabama into a data centre using renewable energy.

It will be the first Google data centre built on the site of a former coal-burning power plant.

"Data centres need a lot of infrastructure to run 24/7, and there's a lot of potential in redeveloping large industrial sites like former coal power plants," Google data centre energy and location strategy manager Patrick Gammons said in a blog post.

The facility will be Google's 14th data centere worldwide to feed a seemingly insatiable appetite for applications or services hosted in the Internet cloud.

Google said that it is working with the Tennessee Valley Authority to deliver electricity from renewable sources for the data centre built on the site of the Widows Creek power plant in Alabama.

Advertisement

Some five years ago, Google became one of the first companies outside the utility industry to buy large amounts of renewable energy and has since become the largest corporate consumer of that kind of power in the world, according to Gammons.

The California-based Internet titan has a stated goal of being completely powered by renewable energy sources.

Advertisement

"Google's data centre in Alabama is a poignant symbol of how quickly our energy economy can change for the better," said Greenpeace senior climate and energy campaigner David Pomerantz.

He pointed to Google's move as proof that major Internet companies want to power facilities with renewable energy and called on US legislators and regulators to take notice.

Advertisement

"Unfortunately, Amazon's recent announcement of several new data centres in Ohio did not include the same commitment to power them with 100 percent renewable energy," Pomerantz said.

"Without a similar level of commitment as we've seen from Google, Apple, and Facebook, Amazon's data centres are more likely to keep coal plants running than to make the Internet a powerful force for renewable energy."

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus Could Exclusively Launch Another 4G Phone in India Next Month
  2. CMF Buds Neo With 35dB ANC, Up to 52 Hour of Battery Launched in India
  3. Asus VM240 AiO All-in-One Desktop PC Debuts Alongside New Gaming Accessories 
  4. Qualcomm Teases Arrival of Two New Snapdragon 8 Elite Chips
  5. iQOO Z11 Launched in India With These Features: See Price
  6. This Is When Apple Can Announce Its iPhone 18 Series Launch Event
  7. iQOO Z11 Review
  8. Here's When the Lava Bold N4 Lite Will Launch in India
  9. Here's How Much the Vivo Y31T 5G Could Cost in India
  10. Moto G Max Goes on Sale in India: Check Price, Offers
  1. Vivo V2607 Geekbench Listing Reveals Key Details: What You Need to Know
  2. Elon Musk’s X Considers Stablecoin-Based Payments for Influencers and Content Providers
  3. Sony's Live Service Co-Op Game Horizon Hunters Gathering Reportedly Being Rebooted After Poor Player Feedback
  4. BitGo Becomes First Global Crypto Firm to Secure South Korea VASP Licence
  5. Huawei Pura X View Pre-Orders Begin; Confirmed to Feature Wide-Screen 16:9.5 Display, 7,000mAh Battery
  6. iQOO Gaming Tablet Tipped to Get Active Cooling, Snapdragon 8 Elite Gen 6 Pro SoC
  7. OnePlus Tipped to Launch a New 4G Phone Exclusively in India Next Month
  8. Qualcomm Teases Two New Snapdragon 8 Elite Chips Ahead of Snapdragon Summit
  9. Lava Bold N4 Lite India Launch Date Announced; Design and Durability Details Teased
  10. Coinbase Expands Tokenisation Push With Abu Dhabi Regulatory Approval
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.