Chandrayaan-2: Vikram Hard Landed Within 500 Metres of Landing Site, Says Government

Chandrayaan-2's Vikram lander details were provided in a Lok Sabha reply. ISRO is planning to launch Chandrayaan-3 probably in November next year.

Advertisement
By Press Trust of India | Updated: 21 November 2019 11:47 IST
Highlights
  • Chandrayaan-2 mission featured an orbiter and a lander
  • The Vikram lander lost contact shortly before landing
  • More details are now emerging about Chandrayaan-2 mission

Chandrayaan-2 separated from the Vikram lander on September 2

Photo Credit: ISRO

In a written reply to a question in the Lok Sabha, Jitendra Singh, the minister of state in the Prime Minister's Office, who looks after the department of space, revealed that Chandrayaan-2's Vikram lander hard-landed as reduction in velocity during its descent did not match with the designed parameters. The reply threw more light on ISRO's dashed hopes of making a soft landing on the lunar surface in its maiden attempt. Singh said the first phase of descent was performed nominally from an altitude of 30km to 7.4km above the moon's surface and velocity was reduced from 1,683 metres per second to 146 metres per second.

"During the second phase of descent, the reduction in velocity was more than the designed value. Due to this deviation, the initial conditions at the start of the fine braking phase were beyond the designed parameters. As a result, Vikram hard-landed within 500 metres of the designated landing site," he said.

Advertisement

Singh, however, said most components of technology demonstration, including the launch, orbital critical manoeuvres, lander separation, de-boost and rough braking phase were successfully accomplished. With regards to the scientific objectives, all the eight state-of-the-art scientific instruments of the orbiter are performing according to the design and providing valuable scientific data. Due to the precise launch and orbital manoeuvres, the mission life of the orbiter is increased to seven years, he said.

Data received from the orbiter is being provided continuously to the scientific community, he said, adding the same was recently reviewed in an all-India user meet organized in New Delhi. The indigenously developed Chandrayaan-2 spacecraft comprising of orbiter, lander and rover was successfully launched on-board the indigenous GSLV MK III-M1 Mission on July 22.

After accomplishing four earth bound manoeuvres and trans-lunar injection, the spacecraft was successfully inserted in the lunar orbit on August 20. A series of moon-bound manoeuvres were then carried out to achieve a Lunar orbit of 119 x 127 km. The Lander 'Vikram' was separated, as planned, from the Orbiter on September 2 2019. After two successful de-orbiting manoeuvres, powered descent of the lander was initiated on September 7 to achieve soft landing on the moon surface.

ISRO is planning to launch Chandrayaan-3 probably in November next year.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: Chandrayaan 2, Vikram, ISRO
Advertisement

Related Stories

Popular Mobile Brands
  1. Redmi K100 Could Launch Soon at This Price: See Expected Specifications
  2. iPhone Duo Screen Repair Costs Almost as Much as an iPhone 18 Pro
  3. Here's How the Oppo Reno 17 Could Look: See Expected Specifications
  4. iQOO Pad Pro 8.8 Launch Confirmed; Specifications Teased
  5. These Old Galaxy Flagships Are Getting the Stable One UI 9 Update
  6. Caller Name Presentation to Become Mandatory From Next Month
  7. Amazon Great Indian Festival 2026: Best Deals on OnePlus Products
  8. Oppo Pad Mini Matte Display Edition, Enco X4 Set to Launch on This Date
  1. iPhone Duo Screen Repair in India Costs Almost as Much as an iPhone 18 Pro
  2. DoT Mandates Caller Name Presentation for 5G and 4G Networks From Next Month
  3. iQOO Pad Pro 8.8 Launch Teased; Confirmed to Feature 9,020mAh Battery
  4. Oppo Reno 17 Design Spotted in Leaked Hands-On Image; Oppo Reno 17 Pro Unlikely to Launch in India
  5. Bitcoin Slips Below $81,000 as Hot US Inflation Revives Fed Rate Concerns
  6. Krafton Renames BGMI Lite to BGMI Air Ahead of Launch in India as Pre-Registrations Cross 10 Million
  7. Samsung Galaxy S27 and Galaxy S27+ to Launch Next Year With the Same Selfie Camera as Galaxy S26: Report
  8. Samsung Galaxy S23 Series, Galaxy Z Fold 5 Start Receiving One UI 9 Update Based on Android 17: Report
  9. Epic Games Releases New 'Vibe Coded' Epic Games Store Launcher in Preview, Faces Backlash Over Bugs
  10. Redmi K100 Launch Price Tipped Online Along With Key Specifications
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.