James Webb Space Telescope Final Unfolding: Primary Mirror to Be Deployed on January 8

James Webb Space Telescope will soon start operating fully.

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 7 January 2022 11:38 IST
Highlights
  • James Webb Space Telescope was launched on Christmas Day
  • James Webb Space Telescope can only be unfolded when it's in orbit
  • James Webb Space Telescope will succeed Hubble

James Webb Space Telescope is the largest and most powerful of its kind

Photo Credit: Twitter/ @NASAWebb

Through the past week, NASA engineers have been working diligently to deploy major equipment and tools aboard James Webb Space Telescope (JWST), including its sunshield and secondary mirror. On Saturday, January 8,  the primary camera of the $10-billion (roughly Rs. 74,340 crore) space observatory will be deployed, which will study the origin of the Universe and exoplanets. With this, the major deployments of the most powerful telescope ever sent into space will conclude. After finishing the unprecedented process of unfolding in space, JWST will start preparing for complex operations.

JWST is a collaborative project between NASA, European Space Agency, and Canadian Space Agency. It was launched on December 25 aboard an Ariane 5 rocket. After being released into space, the telescope gradually began unfolding itself and is now in its final stages. The process is human-controlled and provides the team with the flexibility to pause and adjust. This, sometimes, leads to change in initial plans for deployments.

NASA said it will air live coverage of the final hours of JWST's major deployments. The live coverage is set to begin at 7:30pm IST tomorrow.

Advertisement

The live broadcast is expected to conclude around 12am (midnight) in India, and then NASA will hold a press briefing. Both the broadcast and media briefing will air live on the agency's website.

This will conclude James Webb's major deployments but it will take some more time to get fully operational and replace the Hubble telescope. Once it is ready, JWST will explore every phase of cosmic history. It will help us understand the origins of the universe and our place in it.

Advertisement

Earlier this week, JWST completed tensioning its kite-shaped sunshield, which will keep the telescope cool enough to allow it to capture images of faraway stars and planets. The unfolding of the five layers of the sunshield proved to be a triumph of space engineering. Many initially doubted its success as the design involved a number of motors, gears, cables, and other equipment.


Xiaomi India speaks exclusively to Orbital, the Gadgets 360 podcast, on their plans for 2022 and pushing for 120W fast charging with the 11i HyperCharge. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Samsung Galaxy S26+ Reportedly Listed for Sale Online Ahead of Launch
  2. AI Impact Summit: From Registration to Schedule, All You Need to Know
  3. Apple to Reportedly Launch Low-Cost MacBook in 'Playful Colors' in March
  4. Lava Bold N2 Will Be Launched in India on This Date: See Expected Specs
  5. Tecno Spark 50 4G Launch Timeline, Design, Colourways, Key Features Leaked
  6. Oppo Find X10 Series Could Debut This Year With This iPhone-Like Feature
  7. Samsung's 'Wide' Galaxy Z Fold Design Spotted in Leaked One UI 9 Animations
  1. Apple Tipped to Adopt Samsung's Privacy Display Technology for MacBook Models by 2029
  2. Oppo Find X10 Series Tipped to Launch in H2 2026 With Built-In Magnets for Wireless Charging
  3. AMD and TCS to Co-Develop Helios AI Data Centre Architecture, Deliver 200MW Data Centre Blueprint
  4. Tecno Spark 50 4G Tipped to Launch Globally Soon; Design, Colourways, Key Features Leaked
  5. Lava Bold N2 India Launch Date Revealed; Will Be Exclusively Available via Amazon
  6. Government Green Lights Rs. 10,000 Crore Fund of Funds 2.0 Under the Startup India Mission
  7. Samsung’s 'Wide' Galaxy Z Fold Design Revealed via Leaked One UI 9 Animations
  8. Realme P4 Lite India Launch Date Announced; Design, Colour Options, Key Features Revealed
  9. Kingdom Come: Deliverance's Free Next-Gen Update on PS5, Xbox Series S/X Is Now Out
  10. Vivo X300 FE Reportedly Bags IMDA and TUV Certifications; Charging Specifications Revealed Ahead of Launch
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.