700-Km Long Hyperloop Transportation System Proposed in Andhra

Advertisement
By Indo-Asian News Service | Updated: 7 May 2018 18:14 IST

Hyperloop Transportation Technologies on Monday proposed to set up the Hyperloop transportation system in Andhra Pradesh connecting Anantapur-Amaravati-Vijayawada and Visakhapatnam as part of 700-800km-long integrated public transit system.

The US-based company presented the pre-feasibility route study to officials from the state Capital Region Development Authority (APCRDA) and other nodal state departments. HyperloopTT has associated with Aarvee Associates of Hyderabad to prepare the pre-feasibility and feasibility studies, the company said in a statement.

The entire Hyperloop project is conceived to be implemented in three phases. In Phase I & II, a commercial Hyperloop system between Amaravati and Vijayawada will be built. In Phase III, a commercial Hyperloop System covering either northern or southern section of the vision corridor connecting Anantapur-Amaravati-Vijayawada and Visakhapatnam will be built. Phase II & III are interchangeable and can be implemented at the same time.

Advertisement

The Phase I alignment will be located in either Amaravati or in Vijayawada city running East-West on a 5-10km straight section to showcase the benefits of the system to the stakeholders and general public.

Advertisement

HTT has also proposed setting up a manufacturing complex that will focus on several aspects of the Hyperloop TT project, such as building the tube, capsule, the track and 3D printing.

The HyperloopTT team was represented by Bibop Gresta, Chairman & Co-founder, HyperloopTT, Joel Michael, India Head, HyperloopTT and Sabih Khisaf, Head of Engineering (Middle East & North Africa), Hyperloop TT.

Advertisement

Greta said that Hyperloop TT system is an emerging form of ultra-high-speed ground transportation system that moves people and freight. "By undertaking this project, Andhra Pradesh and India would signal their desire to create a globally competitive region fuelled by ultra-high-speed mobility that is environment positive, energy efficient and sustainable," he said.

He noted the pre-feasibility study that provides a high-level overview of the Hyperloop TT system compiled on local information and data. The report will help the government assess its next move into the next phase of a full Hyperloop TT feasibility study.

Advertisement

Ajay Jain, Principal Secretary, Energy Infrastructure and Investment, said that there is a need for sustainable high-quality robust mass transportation system for proposed capital city of Amaravati, which would house 3.5 million people and create 1.5 million jobs. The plan also proposes 9 theme-based cities within the capital city to serve as the hub of activities serving unique functions and employment generation along with complementary functions.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Cloudflare Is Down Again For the Second Time in Weeks: See Affected Sites
  2. ACT Fibernet Launches New Broadband Plans With Free OTT Subscriptions
  3. OnePlus 15R Surfaces on Benchmarking Site Ahead of India Launch
  4. Flipkart Buy Buy 2025 Sale: Nothing Phone 3, Phone 3a Deals Revealed
  5. Motorola Edge 70 With Pantone's 2026 Colour, Swarovski Crystals Launched
  6. HMD 101, HMD 100 With Built-In Radio Launched in India at These Prices
  7. Nothing Phone 3a Lite Goes on Sale in India at This Price
  8. Realme Says It Will Launch Two New Narzo Smartphones in India Soon
  9. Instamart to Provide 10-Minute Delivery of Samsung Galaxy Devices
  10. Samsung May Launch Official 25W Magnetic Qi2 Charger With Galaxy S26 Series
  1. Cloudflare Outage Blocks Access to Several Websites Including BookMyShow, SpaceX, Coinbase
  2. Samsung Galaxy S26 Series to Offer Built-In Support for Company's 25W Magnetic Qi2 Charger: Report
  3. Airtel Discontinues Two Prepaid Recharge Packs in India With Data Benefits, Free Airtel Xtreme Play Subscription
  4. Samsung Galaxy Phones, Devices Are Now Available via Instamart With 10-Minute Instant Delivery
  5. NotebookLM App Gets an In-Built Camera, Lets Users Upload Images as a Source
  6. HMD 101 Launched in India With 1,000mAh Battery, Auto Call Recording Alongside HMD 100: Price, Features
  7. Crypto Traders Await US Fed Signals as Bitcoin Price Drops to $91,900
  8. Nothing Phone 3a Lite Goes on Sale in India: See Price, Offers, Availability
  9. Realme Narzo Phones Confirmed to Launch in India Soon via Amazon
  10. Samsung Galaxy Watch Ultra 2 Launch Timeline Leaked; Could Debut Alongside Samsung Galaxy Watch 9
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.