700-Km Long Hyperloop Transportation System Proposed in Andhra

Advertisement
By Indo-Asian News Service | Updated: 7 May 2018 18:14 IST

Hyperloop Transportation Technologies on Monday proposed to set up the Hyperloop transportation system in Andhra Pradesh connecting Anantapur-Amaravati-Vijayawada and Visakhapatnam as part of 700-800km-long integrated public transit system.

The US-based company presented the pre-feasibility route study to officials from the state Capital Region Development Authority (APCRDA) and other nodal state departments. HyperloopTT has associated with Aarvee Associates of Hyderabad to prepare the pre-feasibility and feasibility studies, the company said in a statement.

Advertisement

The entire Hyperloop project is conceived to be implemented in three phases. In Phase I & II, a commercial Hyperloop system between Amaravati and Vijayawada will be built. In Phase III, a commercial Hyperloop System covering either northern or southern section of the vision corridor connecting Anantapur-Amaravati-Vijayawada and Visakhapatnam will be built. Phase II & III are interchangeable and can be implemented at the same time.

The Phase I alignment will be located in either Amaravati or in Vijayawada city running East-West on a 5-10km straight section to showcase the benefits of the system to the stakeholders and general public.

Advertisement

HTT has also proposed setting up a manufacturing complex that will focus on several aspects of the Hyperloop TT project, such as building the tube, capsule, the track and 3D printing.

The HyperloopTT team was represented by Bibop Gresta, Chairman & Co-founder, HyperloopTT, Joel Michael, India Head, HyperloopTT and Sabih Khisaf, Head of Engineering (Middle East & North Africa), Hyperloop TT.

Advertisement

Greta said that Hyperloop TT system is an emerging form of ultra-high-speed ground transportation system that moves people and freight. "By undertaking this project, Andhra Pradesh and India would signal their desire to create a globally competitive region fuelled by ultra-high-speed mobility that is environment positive, energy efficient and sustainable," he said.

He noted the pre-feasibility study that provides a high-level overview of the Hyperloop TT system compiled on local information and data. The report will help the government assess its next move into the next phase of a full Hyperloop TT feasibility study.

Advertisement

Ajay Jain, Principal Secretary, Energy Infrastructure and Investment, said that there is a need for sustainable high-quality robust mass transportation system for proposed capital city of Amaravati, which would house 3.5 million people and create 1.5 million jobs. The plan also proposes 9 theme-based cities within the capital city to serve as the hub of activities serving unique functions and employment generation along with complementary functions.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. OTT Releases This Week (April 13 - April 19): Toaster, Matka King, Assi, and More
  2. DJI Osmo Pocket 4 Debuts With 1-inch CMOS Sensor, Improved Stabilisation
  3. Vivo X300 Ultra, Vivo X300 FE Confirmed to Launch in India Soon
  4. Some Samsung Galaxy S27 Series Models May Get This Major Storage Upgrade
  5. Asus Zenbook S14 (2026) First Impressions
  6. Vivo Y600 Pro Will Launch Soon With a 10,000mAh Battery
  7. Oppo Find X9s Pro Specifications Tipped Again Ahead of April 21 Launch
  8. Indian Smartphone Shipments Dropped to a Six-Year Low in Q1 2026: Report
  9. Anthropic's New Claude Opus 4.7 Model Is Still Less Capable Than Claude Mythos
  10. Intel Launches Core Series 3 Processors With Up to 40 TOPS AI Compute
  1. Honor 600 Pro and Honor 600 Key Specifications, Features Revealed via Official Listing
  2. Ethereum NFT Platform Shuts Down After Blacklove Sale Falls Through
  3. Vivo X300 FE Storage Options Leaked Alongside Live Image With Telephoto Extender Kit
  4. Indian Smartphone Shipments Dropped to Six-Year Low in Q1 2026 as Vivo Topped Market, Nothing Led Growth: Counterpoint
  5. Canva Introduces Canva AI 2.0, Brings Agentic Capabilities and Memory to Perform Design Tasks
  6. MediaTek Dimensity 9600 Pro Leak Suggests 5GHz Clock Speed, High Benchmark Scores
  7. Oppo Find X9s Pro Key Specifications Surface Online as Launch Date Draws Closer
  8. Russian-Based Crypto Exchange Grinex Halts Operation After $14 Million Hack
  9. Assassin's Creed: Black Flag Resynced Will Reportedly Release in July, Reveal Set for Next Week
  10. OnePlus Watch 4 Reportedly Listed on Google Play Console With Snapdragon W5 Chip
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.