Government Notifies Green Open Access Rules 2022 to Promote Renewable Energy Projects

The government says there will be transparency in the approval process of open access applications.

Advertisement
By Press Trust of India | Updated: 8 June 2022 13:13 IST
Highlights
  • The government has notified the Green Open Access Rules 2022
  • The rules will accelerate renewable energy programs in India
  • Consumers can now demand green power from power distribution companies

The Green Open Access Rules 2022 were notified on June 6

Photo Credit: Unsplash/ Thomas Coker

The government on Tuesday said it has notified the Green Open Access Rules 2022 to further accelerate India's renewable energy programmes. These rules are notified for promoting generation, purchase and consumption of green energy including through waste-to-energy plants. It enables a simplified procedure for the open access to green power, the power ministry said in a statement.

"In order to further accelerate our ambitious renewable energy programmes, with the end goal of ensuring access to affordable, reliable, sustainable and green energy for all, Green Open Access Rules 2022 have been notified on June 6, 2022," the ministry said.

Advertisement

Consumers can now demand green power from discoms (power distribution companies), it said, adding, "Every consumer becomes stakeholder to contribute in achieving India's commitment of 500GW of non-fossil fuel by 2030." As per the rules, the green open access is allowed to any consumer and the limit of open access transaction has been reduced from 1MW to 100kW for green energy in order to enable small consumers also to purchase renewable power through open access.

There will be transparency in the approval process of the open access applications. As per the rules, the approvals are to be granted in 15 days or else it will be deemed to have been approved subject to fulfilment of technical requirements. It will be through a national portal.

Advertisement

On the tariff, the statement said: "The tariff for the green energy shall be determined separately by the appropriate commission, which shall comprise of the average pooled power purchase cost of the renewable energy, cross-subsidy charges, if any, and service charges covering the prudent cost of the distribution licensee for providing the green energy to the consumers." The rules will help streamline the overall approval process for granting open access, including timely approval, to improve predictability of cash flows for renewable power producers. It will also bring uniformity in the application procedure.

The rules provide certainty on open access charges to be levied on green energy open access consumers, which includes transmission charges, wheeling charges, cross-subsidy surcharge and standby charges.

Advertisement

Cap on increasing the cross-subsidy surcharge as well as the removal of additional surcharge not only incentivises the consumers to go green but also addresses the issues that have hindered the growth of open access in India.

Consumers will be given certificates if they consume green power. Cross subsidy surcharge and additional surcharge shall not be applicable, if green energy is utilised for production of green hydrogen and green ammonia.

Advertisement

Besides, there shall be a uniform renewable purchase obligation on all obligated entities in the area of a distribution licensees.


How is Alexa faring in India? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1.  Xiaomi 18, 18 Pro and 18 Pro Max Specifications Leaked Ahead of Debut
  2. God of War Laufey Revealed at State of Play: Everything You Need to Know
  3. Vivo X500 Pro Max Display and Battery Details Revealed in New Leak
  4. Honor X7e With a 7,500mAh Battery Debuts Globally at This Price
  5. Lumio Launches 55-Inch Variants of Vision 9 (2026), Vision 7 (2026) in India
  6. Motorola Edge 2026 With 6.3-Inch Display Goes Official
  7. Samsung Galaxy A27 Reportedly Bags US FCC Certification, May Launch Soon
  8. RTX Spark-Powered Laptops Could Cost a Lot More Than Regular AI PCs
  9. Realme P4R 5G India Launch Date, Design and Key Specifications Revealed
  10. Marvel's Wolverine Gets Gameplay Trailer at State of Play, Pre-Orders Go Live
  1. UK's FCA Warns Premier League Clubs Over Unauthorised Crypto Sponsor Risks
  2. Vivo X500 Pro Max Display and Battery Details Surface Online in Early Leak; Largest Model Said to Feature 6.85-Inch Screen
  3. Google Introduces Fake Call Detection for Android Phones to Curb Call Spoofing Attacks
  4. Google Rolls Out Gemini Thinking Levels Across Platforms With 'Extended' Thinking Mode for All Users
  5. Samsung Galaxy A27 Reportedly Bags US FCC Certification Ahead of Anticipated Launch
  6. NYDFS, European Banking Authority Join Forces to Oversee, Monitor Stablecoin Activities
  7. Meta Reportedly Testing ‘Series’ Feature to Organise Instagram, Facebook Reels Into Episodic Collections
  8. Xiaomi 18 Tipped to Sport 6.4-Inch Display; Pro Models Said to Feature Dual 200-Megapixel Rear Cameras
  9. Realme P4R 5G India Launch Date Revealed Along With Design and Key Specifications
  10. Marvel's Wolverine Gets Visceral Gameplay Trailer at State of Play, Pre-Orders Now Live
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.