Chandrayaan-2 Successfully Performs Second Orbit Raising Manoeuvre: ISRO

Chandrayaan-2's third orbit raising manoeuvre is scheduled on July 29, 2019, between 2:30 - 3:30pm IST.

Advertisement
By Indo-Asian News Service | Updated: 26 July 2019 11:34 IST

Photo Credit: Twitter/ ISRO

India's second moon spacecraft Chandrayaan-2 put into earth orbit on July 22, on Friday successfully completed its second earthbound orbit-raising manoeuvre, ISRO said.

It was "performed successfully today (July 26, 2019) at 0108 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 883 seconds. The orbit achieved is 251 x 54829 km. All spacecraft parameters are normal," the Indian Space Research Organisation tweeted.

"The third orbit raising manoeuvre is scheduled on July 29, 2019, between 1430-1530 hrs (IST)," it added.

Advertisement

The first one was performed on July 24.

The Chandrayaan-2 is scheduled to reach moon by August 20, the Indian space agency had said on Wednesday.

Advertisement

According to Indian Space Research Organisation (ISRO), the first earth bound orbit raising manoeuvre for Chandryaan-2 spacecraft was successfully performed on Wednesday afternoon by firing the onboard motors for 57 seconds.

On July 22, the Chandrayaan-2 was injected into an elliptical orbit of 170x45,475 km by India's heavylift rocket Geosynchronous Satellite Launch Vehicle-Mark III (GSLV Mk III) in a text book style.

Advertisement

The spacecraft Chandrayaan-2 comprises three segments - the Orbiter (weighing 2,379 kg, eight payloads), the lander 'Vikram' (1,471 kg, four payloads) and rover 'Pragyan' (27 kg, two payloads).

The Indian space agency said the major activities include earth bound manoeuvres, Trans Lunar Insertion, Lunar bound manoeuvres, the lander Vikram separation from Chandrayaan-2 and Vikram touch down on the moon's South Pole.

Advertisement

The ISRO said the Trans Lunar Insertion of Chandrayaan-2 is scheduled on August 14, 2019, which will send the spacecraft to moon.

After that, the Chandrayaan-2 is scheduled to reach moon by August 20, 2019, the ISRO said.

According to ISRO, the lander Vikram will land on the moon on September 7.

Originally the GSLV-Mk III rocket carrying Chandrayaan-2 was supposed to fly on July 15. Owing to a serious technical glitch the flight was postponed to July 22.

As a result, there are changes in the mission schedule.

As per the July 15 flight schedule, Chandrayaan-2's earth bound phase was 17 days and it is 23 days as per the new schedule.

On the other hand, the lunar bound phase which was for 28 days for July 15 flight schedule, has come down to 13 days.

Originally Vikram was planned to land on the moon 54 days after the rocket's lift off and now the landing will take place in 48 days.

 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Further reading: Chandrayaan-2, ISRO
Advertisement

Related Stories

Popular Mobile Brands
  1. Vivo Y31 Series With 6,500mAh Battery Launched in India: See Price
  2. Samsung Begins Rolling Out One UI 8 Update to the Galaxy S25 Series
  3. Nothing Announces Offers on Phones, Wearables During Flipkart Sale
  4. [Exclusive] Noise to Launch Flagship Master Series Over-Ear Headphones Soon
  5. Flipkart Big Billion Days Sale: Discounts on Motorola Phones Announced
  6. iOS 26 Released Alongside iPadOS 26, macOS Tahoe: Here's How to Download It
  7. Samsung Galaxy S25 FE With 50-Megapixel Camera Launched in India: See Price
  8. Oppo F31 Series Launched With 7,000mAh Battery: Check Price, Features
  9. iOS 26 Update for iPhone Releases Today: Everything You Need to Know
  10. The Witcher Season 4 Release Date Revealed: Know When and Where to Watch It Online
  1. The Witcher Season 4 Release Date Revealed: Know When and Where to Watch It Online
  2. iOS 26 Update Released Alongside iPadOS 26 and macOS Tahoe: Check Eligible Models, How to Download
  3. Scientists Propose Space Missions to Chase Down Interstellar Comets
  4. Iceland Plume Discovery Reveals Ancient Volcanic Funnels Across North Atlantic
  5. Huawei Watch Ultimate 2 Design Renders Leaked, Could Launch Soon
  6. Marvel's Wolverine Will Reportedly Launch in 2026; Insomniac's Venom Game in 'Active Development'
  7. US President Donald Trump Challenges Block on Removing US Fed’s Lisa Cook
  8. iPhone 17 Series Outpaces iPhone 16 in Demand While iPhone 17 Pro Max Tops Pre-Orders, Analyst Says
  9. iPhone 16 Remained Top Selling Smartphone For Second Consecutive Quarter Globally: Report
  10. Samsung Galaxy S25 FE Launched in India With 6.7-Inch AMOLED Screen, 50-Megapixel Camera: Price, Features
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.