ISRO to Increase Frequency of Launches to 12 Per Year

Advertisement
By Press Trust of India | Updated: 24 April 2017 17:31 IST

The Indian Space Research Organisation is trying to increase its capacity to deliver by scaling up the frequency of launches to 12 per year from the seven at present by building more satellites and lowering the cost of access to space.

"Earlier, we were doing 2-3 (launches) per year, then we increased it to 4-5, last few years we have been doing seven launches," space agency Chairman A S Kiran Kumar told PTI.

Advertisement

"Now, we are trying to go up to 8-9 PSLV per year, two GSLV-Mk II and one GSLV-Mk III. Total about 12 per year," he said.

ISRO is trying to increase its capacity to deliver by scaling up the frequency of launches by building more satellites, lowering the cost of access to space and also to do heavier satellite launches, the Chairman said.

Advertisement

The space agency is in the process of constructing a second vehicle assembly building to improve the turnaround time and throughput for the PSLV so that with the same launch pad ISRO can do more launches, he said.

Kiran Kumar said approval for a proposal to build a space station was yet to come.

Advertisement

ISRO plans to undertake the Chandrayaan-2 mission in the first quarter of the next calendar year, he said.

"It (Chandrayaan-2) is a fully Indian affair. There is no Russian participation in that," Kiran Kumar said.

Advertisement

"All the developments required for that, all the variable thrust engines, lander, rover....all that work is going on and we are getting ready for this launch," he said.

"Another Mars mission, Venus mission or Asteroids mission...all these possibilities we are working on; study teams are looking at it, and then we will finalise at some point of time and start getting approvals for them," he said.

On reusable launch vehicle, he said ISRO has identified its next steps in terms of air-breathing propulsion system.

"We are now trying to do an experiment where it will demonstrate that the thrust generated is more than the friction so that you have a net positive thrust.

"What we have (already) demonstrated is combustion happening with oxygen and hydrogen. The next step is the thrust whatever is generated should be more than the friction that's going to come up because of the surfaces involved," Kiran Kumar explained.

"Once that is done, then it's a big capability. So we are working towards that now and in terms of reusable launch vehicle I think landing gear system to that and conducting some experiments that is the next step and beyond that we are looking to scale up the model and do the next set of activities," he said.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Science, India
Advertisement

Related Stories

Popular Mobile Brands
  1. Poco C81, C81x to Launch in India With Up to 6,300mAh Battery on This Date
  2. OnePlus Nord CE 6, Nord CE 6 Lite Will Launch in India on This Date
  3. Huawei Pura X Max With 5,300mAh Battery Launched at This Price
  4. Huawei Watch Fit 5 Series Debuts With AMOLED Displays, HarmonyOS: See Price
  5. Apple WWDC 2026 Artwork Teases New Siri Interface, AI Features in iOS 27
  6. Anthropic's AI-Powered Claude Design Is Here to Take on Figma
  7. Huawei Pura 90 Series Launches in China With These Specifications
  1. Huawei Watch Fit 5, Watch Fit 5 Pro Launched With AMOLED Screens, HarmonyOS and Up to 10 Days Battery Life
  2. Apple Withholds Data in India Antitrust Case, CCI Sets Final Hearing
  3. Anthropic Introduces Claude Design, an AI Tool to Generate Visual Prototypes and Pitch Decks
  4. Nee Forever OTT Release Date: When and Where to Watch This Tamil Romantic Drama Online?
  5. Huawei Pura 90 Pro Max Launched With 200-Megapixel Telephoto Camera Alongside Huawei Pura 90, Pura 90 Pro
  6. Nukkad Naatak OTT Release Date: When and Where to Watch This Social Drama Online?
  7. Huawei Pura X Max Launched as Company’s First Wide Foldable With 5,300mAh Battery: Price, Features
  8. Poco C81, Poco C81x India Launch Date Revealed Along With Design and Key Specifications
  9. OpenAI’s Sora Chief, CTO Announce Departure Amid Company’s Growing Enterprise Focus
  10. Apple's Redesigned MacBook Pro Said to Be Delayed Due to Supply Shortages
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.