NASA Unveils Schedule for 'Artemis' 2024 Moon Mission

The original lunar missions were named for Apollo - Artemis was his twin sister in Greek mythology.

Advertisement
By Agence France-Presse | Updated: 24 May 2019 10:48 IST

Photo Credit: NASA

NASA on Thursday unveiled the calendar for the "Artemis" program that will return astronauts to the Moon for the first time in half a century, including eight scheduled launches and a mini-station in lunar orbit by 2024.

The original lunar missions were named for Apollo - Artemis was his twin sister in Greek mythology, and the goddess of hunting, wilderness and the Moon.

Advertisement

Administrator Jim Bridenstine confirmed that Artemis 1 will be an uncrewed mission around the Moon planned for 2020. 

Next will come Artemis 2, which will orbit Earth's satellite with a crew around 2022; followed finally by Artemis 3 that will put astronauts on lunar soil in 2024, including the first woman.

Advertisement

The three will be launched into space by the biggest rocket of all time, the Boeing-led Space Launch System (SLS), which is currently under development but has seen numerous delays and has been criticized in some quarters as a bloated jobs program.

Affixed to its summit will be the Orion capsule, for which Lockheed Martin is the primary contractor.

Advertisement

In addition to these missions, which will be all NASA's efforts, there will be five launches carrying the building blocks of the lunar mini-station "Gateway" which will serve as a staging point for the Moon landing.

These will be carried out between 2022 and 2024 by private space companies, which NASA will pay for their services.

Advertisement

The orbital station will initially consist of a simple power and propulsion element and a small habitat module. In 2024, astronauts will stop there en route to the Moon.

They will then descend to the surface on a lander.

A part of the lander will remain on the Moon while the other part will take off and allow the astronauts to return to their station, where they will board the Orion capsule and return to Earth.

Bridenstine said Thursday that NASA had chosen private firm Maxar to build the station's first module, the power and propulsion element, which would rely on huge solar panels.

In the coming months, NASA will have to decide on who will build the lander. Aerospace giants such as Boeing and Lockheed Martin are vying for the contract as are new players like Jeff Bezos' Blue Origin.

"We're not owning the hardware, we're buying the service," said Bridenstine of the lander. "The goal here is speed. 2024 is right around the corner."

He added: "Our goal is ultimately to move on to Mars and not get stuck on the surface of the Moon"

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Artemis, Jim Bridenstine
Advertisement

Related Stories

Popular Mobile Brands
  1. These OnePlus Smartphones Could Receive the ColorOS 17 Update in India
  2. iOS 27 Beta Code Reportedly Reveals a Key Detail About the Foldable iPhone
  3. Samsung Galaxy S26 FE, Galaxy Tab S12 Reportedly Appear in Google App
  4. Redmi Note 17 Pro Max Listed on NBTC Website Ahead of Imminent Launch
  1. Offline UPI Payments With NFC Support Could Launch in India Soon
  2. Samsung Galaxy S26 Ultra's Privacy Display Feature Gets a Major Upgrade in One UI 9 Beta
  3. OnePlus N6x Design, Colour Options Teased in New Marketing Material Ahead of Imminent Launch in India
  4. OnePlus 11, Nord 4, and Newer Models Tipped to Receive the Android 17-Based ColorOS 17 Update in India
  5. Redmi Note 17 Pro Max Appears on Thailand's NBTC Certification Database, Might Launch Soon
  6. Apple’s First Foldable iPhone Reportedly Appears in iOS 27 Beta Code With a Multi-Battery Setup
  7. X for Android App Undergoes Major Design Overhaul, Enhanced Performance and Reliability
  8. Samsung Galaxy Buds Able to Reportedly Skip Galaxy Unpacked Launch; Could Debut in October
  9. Dell Alienware 16X Aurora, Alienware 16 Area-51 and Alienware 18 Area-51 Launched in India: Price, Specifications
  10. Samsung Galaxy A55, Galaxy A35 One UI 9 Test Builds Reportedly Spotted Ahead of Android 17 Rollout
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.