NASA Unveils Schedule for 'Artemis' 2024 Moon Mission

The original lunar missions were named for Apollo - Artemis was his twin sister in Greek mythology.

Advertisement
By Agence France-Presse | Updated: 24 May 2019 10:48 IST

Photo Credit: NASA

NASA on Thursday unveiled the calendar for the "Artemis" program that will return astronauts to the Moon for the first time in half a century, including eight scheduled launches and a mini-station in lunar orbit by 2024.

The original lunar missions were named for Apollo - Artemis was his twin sister in Greek mythology, and the goddess of hunting, wilderness and the Moon.

Advertisement

Administrator Jim Bridenstine confirmed that Artemis 1 will be an uncrewed mission around the Moon planned for 2020. 

Next will come Artemis 2, which will orbit Earth's satellite with a crew around 2022; followed finally by Artemis 3 that will put astronauts on lunar soil in 2024, including the first woman.

Advertisement

The three will be launched into space by the biggest rocket of all time, the Boeing-led Space Launch System (SLS), which is currently under development but has seen numerous delays and has been criticized in some quarters as a bloated jobs program.

Affixed to its summit will be the Orion capsule, for which Lockheed Martin is the primary contractor.

Advertisement

In addition to these missions, which will be all NASA's efforts, there will be five launches carrying the building blocks of the lunar mini-station "Gateway" which will serve as a staging point for the Moon landing.

These will be carried out between 2022 and 2024 by private space companies, which NASA will pay for their services.

Advertisement

The orbital station will initially consist of a simple power and propulsion element and a small habitat module. In 2024, astronauts will stop there en route to the Moon.

They will then descend to the surface on a lander.

A part of the lander will remain on the Moon while the other part will take off and allow the astronauts to return to their station, where they will board the Orion capsule and return to Earth.

Bridenstine said Thursday that NASA had chosen private firm Maxar to build the station's first module, the power and propulsion element, which would rely on huge solar panels.

In the coming months, NASA will have to decide on who will build the lander. Aerospace giants such as Boeing and Lockheed Martin are vying for the contract as are new players like Jeff Bezos' Blue Origin.

"We're not owning the hardware, we're buying the service," said Bridenstine of the lander. "The goal here is speed. 2024 is right around the corner."

He added: "Our goal is ultimately to move on to Mars and not get stuck on the surface of the Moon"

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Artemis, Jim Bridenstine
Advertisement

Related Stories

Popular Mobile Brands
  1. Dell 15 Refreshed With Up to Intel Core Ultra 7, 15.6-Inch Display
  2. Infinix GT 50 Pro Confirmed to Launch Globally on This Date
  3. Adobe Introduces Agentic Platform CX Enterprise at Adobe Summit 2026
  4. OnePlus Nord CE 6, Nord CE 6 Lite Will Launch in India on This Date
  5. Apple WWDC 2026 Artwork Teases New Siri Interface, AI Features in iOS 27
  6. Cutting Through the Noise: How Amazon India is Reinventing AI Discovery
  7. The Guy Behind Sora AI Video Models Is Leaving OpenAI
  1. Adobe Introduces CX Enterprise, an Agentic AI Platform to Automate Customer Experience for Businesses
  2. Infinix GT 50 Pro Global Launch Date Announced; Will Debut With Liquid Cooling, Pressure-Sensitive Triggers
  3. Huawei Watch Fit 5, Watch Fit 5 Pro Launched With AMOLED Screens, HarmonyOS and Up to 10 Days Battery Life
  4. Apple Withholds Data in India Antitrust Case, CCI Sets Final Hearing
  5. Anthropic Introduces Claude Design, an AI Tool to Generate Visual Prototypes and Pitch Decks
  6. Nee Forever OTT Release Date: When and Where to Watch This Tamil Romantic Drama Online?
  7. Huawei Pura 90 Pro Max Launched With 200-Megapixel Telephoto Camera Alongside Huawei Pura 90, Pura 90 Pro
  8. Nukkad Naatak OTT Release Date: When and Where to Watch This Social Drama Online?
  9. Huawei Pura X Max Launched as Company’s First Wide Foldable With 5,300mAh Battery: Price, Features
  10. Poco C81, Poco C81x India Launch Date Revealed Along With Design and Key Specifications
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.