Chandrayaan-2 Mission Launch on July 15 at 2:51am, ISRO Chief Says

Chandrayaan-2 will use GSLV MK-III vehicle for launch.

Advertisement
By Press Trust of India | Updated: 12 June 2019 16:34 IST
Highlights
  • The ISRO had earlier kept the launch window between July 9-16
  • The landing on the moon would take place on September 6 or 7
  • The mission cost of Chandrayaan-2 would be Rs. 603 crores

ISRO Chairman K Sivan announced on Wednesday announced the launch date of Chandrayaan-2

Photo Credit: Twitter/ ISRO

India's second mission to the Moon, Chandrayaan-2, would be launched on July 15, Indian Space Research Organisation (ISRO) Chairman K Sivan announced on Wednesday. The landing on the Moon near the South Pole, an uncharted territory so far, would be on September 6 or 7, Sivan told reporters here, as the Indian space agency is all set to embark on its most complex mission.

The launch would take place at 2.51am on board the GSLV MK-III vehicle from the spaceport of Sriharikota.

Advertisement

The ISRO had earlier kept the launch window for the mission from July 9 to July 16.

The spacecraft, with a mass of 3.8 tonne, has three modules -- Orbiter, Lander (Vikram), and Rover (Pragyan).

Advertisement

Sivan said Orbiter would have eight payloads, Lander three, and Rover two.

The mission cost of Chandrayaan-2 with regard to the satellite was Rs. 603 crores, he noted. The cost of GSLV MK III is Rs. 375 crores.

Advertisement

According to the ISRO, Orbiter, with scientific payloads, would orbit around the Moon. Lander would soft land on the moon at a predetermined site and deploy Rover.

The scientific payloads on board Orbiter, Lander and Rover are expected to perform mineralogical and elemental studies of the lunar surface.

Advertisement

The Orbiter and Lander modules would be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle. Rover is housed inside Lander.

After the launch into an earth-bound orbit by GSLV MK-III, the integrated module would reach the Moon orbit using the orbiter propulsion module and subsequently, Lander would separate from Orbiter and soft land at the predetermined site, close to lunar South Pole, the ISRO said.

Rover would roll out for carrying out scientific experiments on the lunar surface, it said, noting that instruments were also mounted on Lander and Orbiter for carrying out scientific experiments.

Chandrayaan-2 is an advanced version of the previous Chandrayaan-1 mission, which was launched about 10 years ago.

Chandrayaan-1 had 11 payloads -- five from India, three from Europe, two from the US and one from Bulgaria -- and the mission had the credit for discovery of water on the lunar surface.

The 1.4-tonne spacecraft was launched using PSLV and the orbiter had orbited 100 km from the lunar surface.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Chandrayaan 2, Chandrayaan, K Sivan
Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus N6x vs iQOO Z11 Lite vs Oppo K14x 5G: Price in India, Features Compared
  2. Best Smartphones Under Rs. 50,000 in India Right Now
  1. Sony Not Backing Down From Decision to End Game Discs, Says Will 'Cautiously' Move Forward With Plan
  2. Samsung Galaxy S26 FE Camera Specifications Leaked Ahead of Expected Launch, May Reuse Its Predecessor's Main Rear Camera
  3. Bitcoin Wallet Exploit Costs Users $38 Million in 25-Minute Attack
  4. Tecno's Bezelless Concept Phone Teased Ahead of IFA 2026
  5. HMD Pulse 2, Pulse 2 Plus, Pulse 2 Pro Tipped to Feature 5,000mAh Battery, Unisoc Chipset
  6. Poco C95 Pro 4G, Redmi Note 17 Pro 5G Reportedly Spotted on NBTC Ahead of Expected Launch
  7. Samsung SDS Teams Up With Upbit Operator Dunamu to Explore Stablecoins and AI Payments
  8. Redmi K100 Pro Series Launch Confirmed for August 11; K100 Pro Max Design Revealed
  9. Anthropic Says Claude AI Breached Three Organisations During Cybersecurity Testing
  10. Samsung Working on New Galaxy Buds With Ear Hooks Design, Leak Suggests
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.