Chandrayaan-2 Mission Launch on July 15 at 2:51am, ISRO Chief Says

Chandrayaan-2 will use GSLV MK-III vehicle for launch.

Advertisement
By Press Trust of India | Updated: 12 June 2019 16:34 IST
Highlights
  • The ISRO had earlier kept the launch window between July 9-16
  • The landing on the moon would take place on September 6 or 7
  • The mission cost of Chandrayaan-2 would be Rs. 603 crores

ISRO Chairman K Sivan announced on Wednesday announced the launch date of Chandrayaan-2

Photo Credit: Twitter/ ISRO

India's second mission to the Moon, Chandrayaan-2, would be launched on July 15, Indian Space Research Organisation (ISRO) Chairman K Sivan announced on Wednesday. The landing on the Moon near the South Pole, an uncharted territory so far, would be on September 6 or 7, Sivan told reporters here, as the Indian space agency is all set to embark on its most complex mission.

The launch would take place at 2.51am on board the GSLV MK-III vehicle from the spaceport of Sriharikota.

Advertisement

The ISRO had earlier kept the launch window for the mission from July 9 to July 16.

The spacecraft, with a mass of 3.8 tonne, has three modules -- Orbiter, Lander (Vikram), and Rover (Pragyan).

Advertisement

Sivan said Orbiter would have eight payloads, Lander three, and Rover two.

The mission cost of Chandrayaan-2 with regard to the satellite was Rs. 603 crores, he noted. The cost of GSLV MK III is Rs. 375 crores.

Advertisement

According to the ISRO, Orbiter, with scientific payloads, would orbit around the Moon. Lander would soft land on the moon at a predetermined site and deploy Rover.

The scientific payloads on board Orbiter, Lander and Rover are expected to perform mineralogical and elemental studies of the lunar surface.

Advertisement

The Orbiter and Lander modules would be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle. Rover is housed inside Lander.

After the launch into an earth-bound orbit by GSLV MK-III, the integrated module would reach the Moon orbit using the orbiter propulsion module and subsequently, Lander would separate from Orbiter and soft land at the predetermined site, close to lunar South Pole, the ISRO said.

Rover would roll out for carrying out scientific experiments on the lunar surface, it said, noting that instruments were also mounted on Lander and Orbiter for carrying out scientific experiments.

Chandrayaan-2 is an advanced version of the previous Chandrayaan-1 mission, which was launched about 10 years ago.

Chandrayaan-1 had 11 payloads -- five from India, three from Europe, two from the US and one from Bulgaria -- and the mission had the credit for discovery of water on the lunar surface.

The 1.4-tonne spacecraft was launched using PSLV and the orbiter had orbited 100 km from the lunar surface.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ISRO, Chandrayaan 2, Chandrayaan, K Sivan
Advertisement

Related Stories

Popular Mobile Brands
  1. Athiradi OTT Release Date: When and Where to Watch it Online?
  2. Microsoft Surface, Surface Pro Launched With Snapdragon X2 Chips: See Price
  3. Motorola Razr Fold Review: The Best First-Generation Foldable Ever Made?
  4. Snap Launches Specs AR Glasses With a Built-In Display at This Price
  5. Lenovo Tab Plus Gen 2 Launched With JBL Speaker System
  6. Oppo Reno 16 Series Bags European Certification, Might Launch Globally Soon
  7. OnePlus 16 Said to Feature 185Hz Refresh Rate Display
  8. Redmi Turbo 5 vs Motorola Edge 70 Pro vs Samsung Galaxy A37 5G Compared
  9. Commodore Returns With a Callback 8020 Flip Phone to Curb Phone Addiction
  10. Google's New Update Brings These Android 17 Features to Pixel Phones
  1. Silo Season 3 OTT Release Date Revealed: When and Where to Watch it Online?
  2. Samsung Galaxy Z Fold 8 Wide Appears on IMDA Database, New Wide Foldable Phone Could Arrive Soon
  3. Xiaomi 18 Pro Could Launch Before Standard Xiaomi 18 Model, Tipster Claims
  4. Google Pixel Drop for June Brings Android 17’s Real-Time Screen Reactions, Bubbles Features to Pixel Phones
  5. iPhone 18 to Launch With More RAM to Enable Support for More Advanced Siri AI Features: Report
  6. Cryptocurrency Prices Stabilise as US Fed Rate Cut Outlook Guides Investor Sentiment
  7. Kolahalamedu Out on OTT: Know Where to Stream This Malayalam Survival Thriller Film Online
  8. Microsoft's Copilot Cowork Feature Rolls Out Globally for Microsoft 365 Customers
  9. Sony Unveils Lytia L910 CMOS Image Sensor With LOFIC Structure, 4K 60fps Video Support
  10. Epson Expands EcoTank Portfolio in India With 15 New Printer Models
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.