Nasa Working to Avoid Traffic Jams Around Mars

Advertisement
By Press Trust of India | Updated: 3 August 2015 10:06 IST
With two more Mars orbiters sent into space last year, including India's MOM probe, traffic has picked up around the red planet - so much so that Nasa has bolstered its traffic monitoring process to avoid spacecraft collisions.

The US space agency has beefed up a process of traffic monitoring, communication and manoeuvre planning to ensure that Mars orbiters do not approach each other too closely.

Last year's addition of two new spacecraft orbiting Mars brought the census of active Mars orbiters to five, the most ever, Nasa said.

Advertisement

Nasa's Mars Atmosphere and Volatile Evolution (MAVEN) and India's Mars Orbiter Mission joined the 2003 Mars Express from ESA (the European Space Agency) and two from Nasa: the 2001 Mars Odyssey and the 2006 Mars Reconnaissance Orbiter (MRO).

The newly enhanced collision-avoidance process also tracks the approximate location of Nasa's Mars Global

Advertisement

Surveyor, a 1997 orbiter that is no longer working. It's not just the total number that matters, but also the types of orbits missions use for achieving their science goals.

"Previously, collision avoidance was coordinated between the Odyssey and MRO navigation teams," said Robert Shotwell, Mars Programme chief engineer at Nasa's Jet Propulsion Laboratory, Pasadena, California.

Advertisement

"There was less of a possibility of an issue. MAVEN's highly elliptical orbit, crossing the altitudes of other orbits, changes the probability that someone will need to do a collision-avoidance manoeuvre.

"We track all the orbiters much more closely now. There's still a low probability of needing a manoeuvre, but it's something we need to manage," said Shotwell.

Advertisement

Traffic management at Mars is much less complex than in Earth orbit, where more than 1,000 active orbiters plus additional pieces of inactive hardware add to hazards.

As Mars exploration intensifies, though, and will continue to do so with future missions, precautions are increasing.

The new process was established to manage this growth as new members are added to the Mars orbital community in years to come, Nasa said.

All five active Mars orbiters use the communication and tracking services of Nasa's Deep Space Network, which is managed at Jet Propulsion Laboratory (JPL).

This brings trajectory information together, and engineers can run computer projections of future trajectories out to a few weeks ahead for comparisons.

"It's a monitoring function to anticipate when traffic will get heavy," said Joseph Guinn, manager of JPL's Mission Design and Navigation Section.

"When two spacecraft are predicted to come too close to one another, we give people a heads-up in advance so the project teams can start coordinating about whether any manoeuvres are needed," said Guinn.

The amount of uncertainty in the predicted location of a Mars orbiter a few days ahead is more than two kilometres.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: ESA, MAVEN, Mars, Nasa
Advertisement

Related Stories

Popular Mobile Brands
  1. Apple Back to School Sale: Grab These Deals on MacBook, iPad Models
  2. OnePlus Phones Will Soon Run on ColorOS 17 Instead of OxygenOS
  1. Google Rebrands NotebookLM as Gemini Notebook; Brings Cloud Computing and Search Integration
  2. Samsung Music Studio 5, Music Studio 7 Wi-Fi Speakers Launched in India
  3. Ostium Suspends Trading Following Oracle Security Incident Drains Millions
  4. Oppo’s New A Series, Upcoming OnePlus Mid-Range Smartphones Tipped to Launch With 10,000mAh Batteries
  5. WhatsApp Reportedly Rolls Out Mic Mode Controls for iPhone Calls
  6. Former Rockstar Games Developer Explains Why GTA 6 Maker Launches Games on PC After Consoles
  7. Samsung Galaxy Tab S12 Ultra CAD Renders Leaked Online; Reveals Familiar Look
  8. Apple Back to School Sale Now Live in India, Bringing Offers on MacBook Air, iPad Pro and More
  9. Realme Could Replace Realme UI With ColorOS 17 in India: Report
  10. Nubia NaviX Ultra Design, Colour Options Unveiled Ahead of July 17 Launch
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.