Chandrayaan-2: Obstacles on Lunar Surface May Have Been Stopping Lander From Receiving Signals, Chandrayaan-1 Director Says

The Vikram lander was 2.1-km above the moon's surface when it lost the connection with the ground station at ISRO headquarters.

Advertisement
By ANI | Updated: 9 September 2019 12:31 IST
Highlights
  • ISRO found the location of Lander through a thermal image
  • ISRO lost contact with Vikram Lander minutes before its touchdown
  • The lander was 2.1-km above the moon's surface at that time

Photo Credit: Facebook/ Dr. Mylswamy Annadurai

The obstacles on the lunar surface may have been stopping the lander from receiving the signals, Chandrayaan-1 Director Mylswamy Annadurai said on Sunday. The Indian Space Research Organisation (ISRO) lost contact with the Vikram Lander, one of three components of the Chandrayaan-2, minutes before its touchdown on the lunar surface in the early hours on Saturday.

"As we have located the lander on the lunar surface, we now have to establish contact with it. The place, where the lander alighted is expected to be not conducive enough for the lander to soft-land. There may be some obstacles, which could have been stopping us from establishing the connection," Annadurai told ANI.

Advertisement

The same orbiter which located the lander has also been provided with a communication channel, which envisages such eventuality, he said, adding that a same line of side-channel can be used to establish the communication with the lander.

"In the past, the Chandrayaan's orbiter had beamed the signals towards the lander to establish signals, but in the present case, it has to be seen whether the latter receives it or not," the director added.

"There is always a two-way communication between the orbiter and lander, but we can attempt to communicate through one way."

He, however, asserted that the communication will not be for more than 5-10 minutes.

Advertisement

"It is a tricky situation but our scientists are capable enough to handle it," he added.

The lander was 2.1-km above the moon's surface when it lost the connection with the ground station at ISRO headquarters in Bengaluru.

Advertisement

Earlier today, ISRO chairman K Sivan had told ANI that the agency has found the location of Lander through a thermal image clicked by the Orbiter, which is already in the intended orbit around the Moon.

Sivan, however, maintained that no communication has been established with the Lander and that the agency will try to establish it in the next 14 days.

Advertisement

Chandrayaan-2 was launched from the Satish Dhawan Space Centre in Sriharikota on July 22.

After revolving around the earth's orbit, the spacecraft began its journey to the moon on August 14 and all manoeuvres were carried out to perfection until the last few minutes of descent.

The incident saw all of India uniting in showing their support to the space agency and its scientists, who have said that moon mission has accomplished at least 90 to 95 percent of its objectives despite the severance of communication with the Lander.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Best Gaming Laptops Under Rs. 80,000 in India
  2. Amazon Prime Day 2026: Best Deals on Redmi and Xiaomi Smartphones
  3. Best Camera Phones Under Rs. 30,000 for Content Creators in India
  4. Amazon Prime Day 2026: 55-inch Smart TV Deals from Lumio, Samsung and More
  5. Everything We Know About the Nothing Phone 4b
  1. Amazon Prime Day 2026 Laptop Deals: Best Discounts on HP, Asus, Lenovo, Dell, Acer Models
  2. Best Camera Phones Under Rs. 30,000 for Content Creators in India: Motorola Edge 70 Fusion, Galaxy F56, More
  3. Boat Stone 900 Launched in India With Up to 80W Sound Output, Up to 15 Hours Audio Playback: Price, Features
  4. Cyberpunk 2077 Has Sold 40 Million Copies, CD Projekt Red Confirms
  5. Nothing Phone 1 Receives Final Software Update With Latest Security Patches, Bug Fixes and Improvements
  6. Nokia 235 4G (2026), 215 4G (2026) Launched Alongside Nokia 210 4G, and 200 4G With AI Assistant Button
  7. Samsung Galaxy S27 Ultra Battery Details Leaked; Could Top iPhone 18 Pro Max's Battery Capacity
  8. OnePlus Ace 7 Series Tipped to Feature 185Hz Display, 9,000mAh Battery
  9. WhatsApp Rolls Out Primary Device Support on iPad, Tests New Setup Screen for Android Tablets: Report
  10. Government Directs App Stores to Remove Malicious Apps Used to Disrupt E-Rickshaw Operations: Report
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.