Isro Begins Countdown for GSLV-Mark III, Crew Module Launch on Thursday

Advertisement
By Indo-Asian News Service | Updated: 17 December 2014 11:14 IST
The countdown for the Thursday morning test launch of India's heaviest and next generation rocket-Geosynchronous Satellite Launch Vehicle (GSLV-Mark III) carrying a crew module began at 9am IST on Wednesday, said a senior official of the Indian space agency Isro.

Though called a crew module, it will not carry any living being and is being sent up only to test its re-entry characteristics.

"The countdown for the rocket launch has just started. Everything relating to the rocket launch is clear. The rocket launch is slated for Thursday at 9.30 a.m," M. Y.S. Prasad, director of the Satish Dhawan Space Centre in Sriharikota, told IANS over phone.

The 630-tonne rocket will be powered by liquid and solid fuel engines while the cryogenic stage/ engine will be a passive one.

Advertisement

During the countdown, the rocket's liquid fuel engine will be fuelled up and the passive cryogenic engine at the top will be filled with liquid nitrogen for mass simulation, Prasad said.

Advertisement

Earlier speaking to IANS, Prasad said the rocket's electronic systems would be switched on around 1am IST on Thursday.

The actual cryogenic engine to power the rocket carrying an around four tonne satellite is under development and is expected to be ready in two years time.

Advertisement

As the other rocket engines are ready, Isro decided to have this mission.

The experimental mission will cost Rs. 155 crores and will not carry any satellite as the cryogenic engine needed for the purpose is under development, Prasad reiterated.

Advertisement

As to the crew module, it will not carry any living being and is only for study purposes.

The main objective of the crew module is to demonstrate its re-entry flight and aero-braking; end-to-end parachute system validation.

The rocket will go up to 126km and then the crew capsule will be detached and it will fall into the Bay of Bengal, 20 minutes after blast off.

The descent speed of the crew module will be controlled by onboard motors for some distance and then by three parachutes.

The module will splash down 600km from Port Blair and 1,600km from the space centre. The capsule will be recovered by an Indian Coast Guard or Indian Navy ship.

The crew module, looking like a giant-size cup cake - black in colour on top and brown at the bottom - weighs around four tonnes.

According to an Indian Space Research Organisation (Isro) official, it will be in the size of a small bedroom and can accommodate 2-3 people.

"The crew module after being recovered from the sea will first be taken to the Ennore Port (near Chennai) and from there it will be brought to Sriharikota. From Sriharikota the module will be taken to VSSC (Vikram Sarabhai Space Centre-Thiruvananthapuram)," Prasad said.

On Monday, all the pyro systems fitted in the rocket were armed, he said.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Xiaomi 17 Series Leak Hints at Imminent Launch Ahead of MWC at These Prices
  2. Vivo X300 FE Reportedly Bags IMDA and TUV Certifications Ahead of Launch
  3. AI Impact Summit: From Registration to Schedule, All You Need to Know
  4. Samsung Galaxy S26+ Reportedly Listed for Sale Online Ahead of Launch
  5. Oppo Find X10 Series Could Debut This Year With This iPhone-Like Feature
  6. Tecno Spark 50 4G Launch Timeline, Design, Colourways, Key Features Leaked
  7. PS6 Could Reportedly be Delayed to 2029 Due to RAM Shortage
  8. Lava Bold N2 Will Be Launched in India on This Date: See Expected Specs
  9. iPhone 18 Series May Arrive Without a Physical SIM Slot in This Region
  10. Deals on iPhone 17, Google Pixel 10 and More During Flipkart Sale
  1. Sony Could Reportedly Delay PS6 to as Late as 2029 Due to RAM Shortage
  2. iPhone 18 Series to Drop SIM Card Slot in Europe to Make Room for Slightly Larger Battery: Report
  3. Poco X8 Pro Spotted on Geekbench With MediaTek Dimensity 8500 Ultra SoC, Android 16
  4. Xiaomi 17, Xiaomi 17 Ultra Global Price Details, Launch Date and Colour Options Leaked
  5. X Building Smart 'Cashtags' to Let Users Check Cryptocurrency Prices in Real-Time
  6. Samsung Galaxy A27 5G Listing on IMEI Database Suggests a Galaxy A26 Successor Is on the Way
  7. Anthropic Inaugurates First Indian Office in Bengaluru, Starts Hiring Local Talent
  8. Apple Tipped to Adopt Samsung's Privacy Display Technology for MacBook Models by 2029
  9. Oppo Find X10 Series Tipped to Launch in H2 2026 With Built-In Magnets for Wireless Charging
  10. AMD and TCS to Co-Develop Helios AI Data Centre Architecture, Deliver 200MW Data Centre Blueprint
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.