NASA’s Artemis 1 Launch Faces Another Obstacle, Next Launch Window in October

NASA scheduled the Artemis 1 mission launch for Tuesday.

Advertisement
By Agence France-Presse | Updated: 24 September 2022 10:09 IST
Highlights
  • NASA's new liftoff of the Artemis 1 mission is threatened by a storm
  • The storm is currently located south of the Dominican Republic
  • The next launch window will run from October 17 to 31

Artemis 2 will take astronauts into orbit around the Moon without landing on its surface

Photo Credit: Twitter/@JimFree

NASA's historic uncrewed mission to the Moon is facing fresh difficulties. After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

Advertisement

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realised we also need to be really paying attention and thinking about a plan B."

Advertisement

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

Advertisement

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometres per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

Advertisement

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.


Can Moto's new premium phones take on iPhone, OnePlus, and Samsung? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Top OTT Releases of the Week: Kantara Chapter 1, Lokah Chapter 1, Idli Kadai, and More
  2. Samsung Galaxy S26 Series Specifications Leaked in Full
  3. Lava Agni 4 Teased With Dual Rear Camera System Ahead of Launch
  4. Sora App Now Lets You Create Cameos of Pets, Objects and Drawings
  5. Microsoft Announces Windows 11 Insider Preview Build With These Features
  6. Xiaomi 17, Poco F8 Series and Redmi Note 15 Certified, Could Launch Soon
  1. Lava Agni 4 Teased to Come With Dual Rear Camera System; Certification Site Listing Reveals Battery Specifications
  2. Microsoft Announces Latest Windows 11 Insider Preview Build With Ask Copilot in Taskbar, Shared Audio Feature
  3. Samsung Galaxy S26 Series Specifications Leaked in Full; Major Camera Upgrades Tipped
  4. iPhone 18 Pro Tipped to Launch in Burgundy, Coffee, and Other New Colour Options
  5. SpaceX Revises Artemis III Moon Mission with Simplified Starship Design
  6. Rare ‘Second-Generation’ Black Holes Detected, Proving Einstein Right Again
  7. Starlink Hiring for Payments, Tax and Accounting Roles in Bengaluru as Firm Prepares for Launch in India
  8. Google's 'Min Mode' for Always-on Display Mode Spotted in Development on Android 17: Report
  9. OpenAI Upgrades Sora App With Character Cameos, Video Stitching and Leaderboard
  10. Samsung's AI-Powered Priority Notifications Spotted in New One UI 8.5 Leak
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.