NASA’s Artemis 1 Launch Faces Another Obstacle, Next Launch Window in October

NASA scheduled the Artemis 1 mission launch for Tuesday.

Advertisement
By Agence France-Presse | Updated: 24 September 2022 10:09 IST
Highlights
  • NASA's new liftoff of the Artemis 1 mission is threatened by a storm
  • The storm is currently located south of the Dominican Republic
  • The next launch window will run from October 17 to 31

Artemis 2 will take astronauts into orbit around the Moon without landing on its surface

Photo Credit: Twitter/@JimFree

NASA's historic uncrewed mission to the Moon is facing fresh difficulties. After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

Advertisement

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realised we also need to be really paying attention and thinking about a plan B."

Advertisement

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

Advertisement

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometres per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

Advertisement

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.


Can Moto's new premium phones take on iPhone, OnePlus, and Samsung? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Advertisement

Related Stories

Popular Mobile Brands
  1. Samsung Galaxy S26 Ultra, Galaxy S26 Pro Charging Speed Leaked
  2. Samsung Galaxy Tab A11, Tab A11+ Design, Features Leaked Ahead of Launch
  3. Vivo V60e 5G Design, Price Leaked; May Use Same Chip as Vivo V50e
  1. Sony Said to Be Planning State of Play Broadcast for Next Week
  2. France Could Block Crypto Firms With MiCA Licenses Due to Enforcement Gap Concerns
  3. Oppo Find X9 Pro With Dimensity 9500 SoC Scores 4 Million Points on AnTuTu; Spotted on Geekbench
  4. Xiaomi 17 Pro Design Render Gives Us a Good Look at Its Leica-Branded Rear Cameras, Secondary Display
  5. Clair Obscur: Expedition 33 Has Sold 4.4 Million Copies in Less Than Six Months of Launch
  6. Materialists Now Streaming on Netflix: What You Need to Know About Dakota Johnson’s Starrer Movie
  7. The Trial Season 2 OTT Release Date: When and Where to Watch Kajol’s Legal Drama Series Online
  8. Ghaati OTT Release Reportedly Revealed Online: When and Where to Watch Anushka Shetty-Starrer Movie Online?
  9. American Express Launches NFT Passport Stamps to Commemorate Travel Memories
  10. Huawei Watch GT 6, GT 6 Pro Price, Specifications Leak Ahead of September 19 Launch: Report
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.