Nasa 'Flying Saucer' Test Bedevilled for Second Time by Botched Parachute

Advertisement
By Reuters | Updated: 9 June 2015 09:34 IST
Nasa's test run of a Mars landing system came to a quick end on Monday when the saucer-shaped vehicle's parachute tore away after partly unfurling high over the Pacific Ocean, a Nasa TV broadcast showed.

A similar problem bedevilled the Low Density Supersonic Decelerator's (LDSD) debut run last year. The parachute was redesigned and reinforced for the second flight, but more work will be needed before the system is ready to land heavy loads on Mars.

"This is exactly why we do tests like this," Nasa engineer and LDSD mission commentator Dan Coatta said after the test. "When we're actually ready to send spacecraft to Mars, we know that they are going to work when that big mission is on the line."

Advertisement

The 100-foot diameter parachute - the largest ever tested - was the second part of a two-part supersonic braking system Nasa has been developing for about five years, at a cost of about $230 million.

Like last year, LDSD's doughnut-shaped extension ring inflated as expected, adding surface area to increase the amount of friction and slow the vehicle's descent through the atmosphere.

Advertisement

Monday's test began with a massive helium balloon lifting off from the U.S. Navy Pacific Missile Range Facility on Kauai, Hawaii, at 7:43 a.m. HST (1743 GMT.)

About three hours later, the balloon reached its targeted altitude of 120,000 feet (36,576 meters), at which point LDSD separated for its test run. A solid-rocket motor booted LDSD up to about 180,000 feet (54,864 meters) - roughly five times higher than where commercial passenger jets fly - and sent it soaring at nearly 3,000 mph (4,828 kph), or four times the speed of sound.

Advertisement

The speed and altitude were intended to simulate conditions that a spacecraft plunging through the thin atmosphere of Mars would experience.

Recovery ships were standing by in the Pacific to recover the spacecraft, parachute and other equipment.

Advertisement

© Thomson Reuters 2015

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Google's Android XR Glasses With Gemini AI to Launch Later This Fall
  2. Google IO 2026: Here's Everything That Was Announced During the Event
  3. Here's How the Oppo Reno 16 Series Will Look
  4. Motorola Edge 2026 Leaked Renders Show Off the Design
  5. Redmi Turbo 5 India Launch Timeline, Key Features Leaked
  6. Moto G37, Moto G37 Power Launched in India With These Features
  7. Android 17 Leak Reveals Google's Noto 3D Emojis
  8. Samsung Galaxy S27 Pro Tipped to Launch With Compact Design, Ultra Features
  1. Google IO 2026: Here’s Everything That Was Announced From Gemini 3.5 Flash to Gemini Omni
  2. Google I/O 2026: Google, Samsung Showcase Gemini-Powered Android XR Smart Glasses
  3. Google I/O 2026: Gemini Omni for AI Videos, Gemini 3.5 Series Models Unveiled
  4. Google I/O 2026: Gemini Spark Brings Agentic Experiences Across Google Docs, Slides and More Apps
  5. Massive Solar Storm Reveals How Mars Is Losing Its Atmosphere
  6. Samsung Galaxy S27 Series Tipped to Include New Pro Model; Galaxy S27 Ultra Said to Offer Hardware Upgrades
  7. Redmi Turbo 5 India Launch Timeline Leaked, Tipped to Retain Same Features as Chinese Variant
  8. Airtel Introduces Priority Postpaid With India's First 5G Network Slicing Starting at Rs. 449
  9. Echo Protocol Exploit Sees Hacker Mint Unauthorised eBTC Worth $76.7 Million
  10. Xiaomi 17T Pro, Xiaomi 17T Price and Specifications Surface on Retail Listing Ahead of May 28 Launch
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.