Nasa Signs $490 Million Contract With Russia for ISS Travel

Advertisement
By Agence France-Presse | Updated: 6 August 2015 11:04 IST

Nasa has extended a contract with Russia's space agency for $490 million (roughly Rs. 3,124 crores) to carry US astronauts to the International Space Station amid a lack of Congressional funding, the US agency said Wednesday.

The United States will continue to rely exclusively on Russia to take astronauts to the orbiting outpost under the new contract, which runs until 2019, even as relations between the two countries have reached their lowest point since the Cold War.

Advertisement

The United States has been dependent on Russia for ISS access since it ended its space shuttle program in July 2012.

Nasa said a lack of funding for development of private vessels by US companies Boeing and SpaceX over the last five years has left Nasa with no other option.

As a result, the United States will pay for use of space vessels belonging to the Russian Federal Space Agency (Roscosmos), even as Washington imposes harsh economic sanctions on Russia over its suspected support of separatists fighting Kiev forces in eastern Ukraine.

Nasa Administrator Charles Bolden warned Congress in a letter Wednesday that Boeing and SpaceX may not be ready by the end of 2017 to carry out a plan to send up their first manned vessels if funding requested by President Barack Obama is not granted in the 2016 budget.

Advertisement

The program requires $1.24 billion (roughly Rs. 7,906 crores) to reach its goals, Bolden said.

"The fastest path to bringing these new systems online, launching from America, and ending our sole reliance on Russia is fully funding Nasa's Commercial Crew Program in FY 2016," Bolden wrote.

Advertisement

The Republican majority in the House of Representatives and Senate have proposed reducing that sum by $250 million (roughly Rs. 1,594 crores) and $300 million (roughly Rs. 1,912 crores) respectively.

If Congress goes forward with these cuts, it "would likely result in funds running out for both contractors during the spring/summer of FY 2016" Bolden said.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus 16 Software Testing Reportedly Begins; Could Launch In India Soon
  2. iQOO Neo 12 Launch Date, Colour Options Revealed
  1. Cysic Shuts Down Bridge After Attacker Illegally Creates 10 Million CYS Tokens
  2. JPM Coin Arrives on Ethereum as JPMorgan Expands Institutional Payments
  3. Vivo V80 FE Reportedly Spotted on BIS Certification Website, India Launch Seems Imminent
  4. Airtel’s New Recharges in India Announced: Rs. 185, Rs. 203 and Rs. 206 Voice-Only Plans Details
  5. Vivo X500 Ultra Leak Reveals Launch Timeline, Chipset, Display and Key Specifications
  6. iQOO Neo 12 Launch Date Announced; Design, Colour Options Teased
  7. Qubic Halts Chain as Attacker Exploits Weak Seeds to Drain 1,400 Wallets
  8. iPhone Duo Battery Capacity Revealed Days Before Foldable Goes on Sale
  9. Poco X8s Gets Listed on Another Certification Website, Hinting at Imminent Launch
  10. Redmi Pad 3 Spotted on Multiple Certification Sites Ahead of Launch; Key Specifications Revealed
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.