India's Third International Internet Gateway to Be Operational Soon

Advertisement
By Indo-Asian News Service | Updated: 14 January 2016 12:26 IST
India's third international Internet gateway, after Mumbai and Chennai, would be operational in Agartala within a month, BSNL chief general manager (North-East one circle) K.K.Saxena said Agartala on Thursday.

Union Communications and Information Technology Minister Ravi Shankar Prasad on July 11 last year laid the foundation stone Agartala for the third international Internet gateway (IIG) through Cox's Bazar in Bangladesh.

"Laying of the optical fibre cable (OFC) link between Akhaura (along Agartala) and Cox's Bazar has been completed and the final testing is now going on. This would be the country's third international Internet gateway after Mumbai and Chennai and it would be operational in a month," Saxena told reporters.

He said: "When the IIG would be operational, there would not only be a sea change in the Internet and telecommunication connectivity in northeast India, but the other parts of the country would also be benefited by getting additional Internet bandwidth."

Advertisement

The official said the Indian government has spent Rs. 20 crore to create the infrastructure, including laying of OFC to avail the 10 gigabit bandwidth from Bangladesh Submarine Cable Company Limited (BSCCL).

Advertisement

He said: "India had to give around Rs. 8 crore per year as rental fee to BSCCL to avail the telecommunication linkages."

In the presence of Prime Minister Narendra Modi and Bangladeshi Premier Sheikh Hasina, an agreement was signed in Dhaka on June 6 between the BSCCL and BSNL for leasing of international bandwidth for Internet at Akhaura.

Advertisement

Akhaura is the second largest trading point and checkpost between India and Bangladesh after Petrapole-Benapole trade centre and checkpost along West Bengal.

"After more than four years of diplomatic and political parleys, the deal was signed between BSCCL and BSNL," the BSNL official added.

Advertisement

The official said so far northeastern states have been getting Internet connectivity through Mumbai and Chennai international Internet gateway but the distance was creating lots of problems, including very weak speed and drop of linkages.

"The Internet connectivity from Bangladesh would be unimpeded and have high-speed with large bandwidth besides most reliable."

Chief Minister Manik Sarkar had on a number of occasions written letters to Modi and former prime minister Manmohan Singh for alternative telecom routing through Bangladesh for improving feeble telecommunication facilities in the northeast region.

The Bangladesh Telecommunications Company has laid optical fibre cable of the 30 km distance from Brahmanbaria to Akhaura, which adjoins Agartala, while the BSNL will set up international long distance (ILD) gateway at Agartala along with associated equipment.

India had set up a multi-purpose integrated checkpost at a cost of around Rs. 80 crore in Agartala adjacent to Akhaura. The Indian government has also embarked upon to laying 15-km railway track to link Agartala railway station with Akhaura railway station in eastern Bangladesh.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: BSNL, Internet
Advertisement

Related Stories

Popular Mobile Brands
  1. Realme Narzo 90 Series With 7,000mAh Battery Launched in India: See Pricing
  2. Redmi Note 15 5G Chipset Revealed Ahead of January 6 India Launch
  3. Lenovo Idea Tab Plus Launched in India With 10,200mah Battery: Details
  4. Realme 16 Pro to Launch With Urban Wild Design in These Four Colourways
  5. Vivo S50, S50 Pro Mini With Snapdragon Chips Launched at These Prices
  6. Google Says It Will Discontinue Its Dark Web Reports Due to This Reason
  7. SBI YONO 2.0 Launch: State Bank of India Reportedly Targets 20 Crore Users
  8. Hollow Knight: Silksong's First Expansion, Sea of Sorrow, Is Coming Next Year
  9. Samsung Galaxy A07 5G Visits Geekbench With This Chipset
  10. Honor Power 2 Key Features Leaked; Could Launch With a 10,080mAh Battery
  1. Honor Power 2 Chipset, Display Specifications Tipped; Could Launch With 10,080mAh Battery
  2. Hollow Knight: Silksong's First Major Expansion, Sea of Sorrow, Announced; Launch Set for 2026
  3. Oppo Find X9 Ultra Battery Capacity Teased By Company Executive: Here's What We Know So Far
  4. Dhruv64: India’s First Homegrown 64-Bit Dual-Core Microprocessor Unveiled
  5. Disney CEO Says AI Deal With OpenAI Is Exclusive For Just One Year: Report
  6. Arasayyana Prema Prasanga Streaming Online: Know Where to Watch This Kannada Film
  7. Filmfare OTT Awards 2025 Winners: Black Warrant, Paatal Lok Season 2, Girls Will Be Girls, and More
  8. Thamma Now Streaming on Amazon Prime Video: Watch Ayushmann Khurrana and Rashmika Mandanna in This Horrer Comedy
  9. Realme 16 Pro Series Colourways Revealed; Company Announces Design Collaboration With Naoto Fukasawa
  10. Samsung Galaxy A07 5G Key Specifications Spotted in Geekbench Listing, Could Launch Soon
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.