Microsoft Deploys Data Centre on Sea Floor to Test Energy Efficiency

Advertisement
By Indo-Asian News Service | Updated: 6 June 2018 18:42 IST
Highlights
  • Microsoft has deployed a shipping container size prototype
  • It has been deployed near Scotland's Orkney Islands
  • Cost of cooling the computers will be cut by placing them underwater

Photo Credit: Scott Eklund/ Red Box Pictures

In a major step towards making data centres energy self-sufficient, Microsoft has deployed an experimental, shipping container size prototype on the seafloor near Scotland's Orkney Islands.

Having data centres with their own sustainable power supply could boost Internet connectivity around the world as data centres are regarded as the backbone of the Internet and the physical clouds of Cloud.

This could be a boon especially for people living in coastal cities. By putting data centres in bodies of water, data would have a short distance to travel to reach coastal communities, leading to fast and smooth Internet connectivity.

Advertisement

Microsoft announced the deployment of the data centre, named Northern Isles, on Tuesday.

Advertisement


The initiative is part of the tech giant's Project Natick, a years-long research effort to investigate manufacturing and operating environmentally sustainable, pre-packaged data centre units that can be ordered to size, rapidly deployed and left to operate lights out on the seafloor for years.

The data centre was assembled and tested in France and shipped on a flatbed truck to Scotland where it was attached to a ballast-filled triangular base for deployment on the seabed.

Advertisement

A cable from the Orkney Island grid sends electricity to the data centre, which requires just under a quarter of a megawatt of power when operating at full capacity.

The theory is that the cost of cooling the computers will be cut by placing them underwater, the BBC reported on Wednesday.

Advertisement

"We think we actually get much better cooling underwater than on land," Ben Cutler, who is in charge of Project Natick, was quoted as saying.

The 40-feet long Northern Isles data centre is loaded with 12 racks containing a total of 864 servers and associated cooling system infrastructure.

This is a tiny data centre compared with the giant sheds that now store so much of the world's information, but with enough room to store five million movies, the BBC report added.

It is designed to remain in operation without maintenance for up to five years.

If Project Natick proves a success, Microsoft envisages sinking groups of five of these cylinders, the report said.

Microsoft said that for now, Project Natick is an applied research project, focused on determining the economic viability of operating containerised data centres offshore near major population centres to provide Cloud computing for a world increasingly dependent on Internet connectivity.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. This Is How You Can Get ChatGPT Go Subscription for Free
  2. Apple's iOS 26.1 Update Rolls Out With New Features, Several Security Fixes
  3. Oppo Reno 15 Appears on Geekbench With MediaTek Dimensity 8450 SoC
  4. Red Magic 11 Pro Launched in Global Markets With Slightly Smaller Battery
  5. Poco F8 Pro, F8 Ultra Set for Global Launch 'Really Soon', Tipster Claims
  6. Moto G67 Power 5G Specifications Revealed: See Storage Variants, Features
  7. Samsung Galaxy S26 Ultra Said to Get a Major Design Upgrade
  8. Here Are the Best Smartphones Under Rs 20,000 With AMOLED Display
  9. Samsung Galaxy A57 Spotted on Company's Test Server With This Model Number
  1. Grab Superapp Says AI Models Struggle to Understand Asian Languages
  2. Crypto Market Consolidation Sees Bitcoin Price Drop Under $105,000 as Market Liquidations Cross $1.1 Billion
  3. Moto G67 Power 5G Specifications, Storage Variants Revealed Before Launch in India
  4. Microsoft is Rolling Out ROG Xbox Ally's Xbox Full Screen Experience on MSI Claw Handhelds
  5. Vivo Y500 Pro Launch Date, Key Features Announced; Listed on Geekbench With Dimensity 7400 SoC
  6. Apple Releases iOS 26.1 Update With New Liquid Glass Setting, Several Security Fixes
  7. Samsung Galaxy S26 Ultra Said to Get a Major Design Upgrade, to Be More Ergonomic
  8. Oppo Reno 15 Listed on Geekbench With Dimensity 8450 SoC, Could Launch Soon
  9. OpenAI Turns to Amazon in $38 Billion Cloud Services Deal After Restructuring
  10. OpenAI’s ChatGPT Go Plan Is Now Available for Free: Know How to Get It
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.