NASA Artemis I SLS Rocket Passes Fueling Test Ahead of Planned September 27 Launch Date: Details

NASA engineers were able to get a small hydrogen leak under control during the fuelling test, according to the US space agency.

Advertisement
By Agence France-Presse | Updated: 22 September 2022 11:43 IST
Highlights
  • Artemis 2 would take astronauts to Moon without landing on its surface
  • NASA has set October 2 as a backup date
  • NASA wants to build a lunar space station called Gateway

NASA is targeting a September 27 launch date for its Artemis I mission

Photo Credit: Twitter/ @NASAArtemis

NASA said Wednesday it had successfully trialed the fuelling process for its new rocket, after technical issues a few weeks ago halted two attempts to get the behemoth off the ground and headed towards the Moon.

"All of the objectives that we set out to do we were able to accomplish today," said Charlie Blackwell-Thompson, launch director of the program called Artemis 1.

Advertisement

The unmanned mission hopes to test the new 30-story SLS rocket as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

The last attempt in early September to launch NASA's most powerful rocket yet had to be aborted because of a leak while its cryogenic fuels — liquid hydrogen and oxygen — were being pumped into the rocket's tanks.

Advertisement

Repairs were carried out and Wednesday's test involved filling those tanks again.

Though a small hydrogen leak was detected during the test, NASA engineers were able to get it under control.

Advertisement

Last week NASA said it is now aiming for September 27 as the next date for liftoff. October 2 was set as a backup date.

"Teams will evaluate the data from the test, along with weather and other factors, before confirming readiness to proceed into the next launch opportunity," NASA said.

Advertisement

Asked about the timing of the next launch attempt, Blackwell-Thompson declined to comment, though she said she was "extremely encouraged by the test today."

US officials are also keeping a close eye on Hurricane Fiona's trajectory off the coast in the Atlantic.

For the September 27 date to be possible, NASA must receive a waiver to avoid retesting the batteries on a detonation system used to destroy the rocket if it strays uncontrollably off course.

The next mission, Artemis 2, would take astronauts to the Moon without landing on its surface, while the third — set for the mid-2020s — would see the first woman and person of colour on lunar soil.

NASA wants to build a lunar space station called Gateway and keep a sustained presence on the Moon to gain insight into how to survive very long space missions, ahead of a mission to Mars in the 2030s.


Buying an affordable 5G smartphone today usually means you will end up paying a "5G tax". What does that mean for those looking to get access to 5G networks as soon as they launch? Find out on this week's episode. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Artemis 1
Advertisement

Related Stories

Popular Mobile Brands
  1. Nothing Phone (4b) Goes on Sale in India: See Price, Offers
  2. OnePlus Is Reportedly Preparing to Withdraw From These Two Markets
  3. Nvidia's GeForce Now Cloud Gaming Service Is Finally Available in India
  1. Nothing Phone (4b) With 6,000mAh Battery, Glyph Bar Goes on Sale in India: Price, Offers
  2. Bitcoin Holds Near $62,500 as Crypto Investors Remain Cautious Ahead of US Inflation Data
  3. Google Pixel 11, Pixel 11 Pro and Pixel 11 Pro XL Visit the US FCC Database a Month Ahead of Their Debut
  4. WhatsApp Might Soon Let iPhone Users Back Up Chats Without Using iCloud Storage
  5. Nvidia's GeForce Now Cloud Gaming Service Launched in India With Up to 5K Gaming Support: Prices, Benefits
  6. Microsoft Finally Gives Windows 11 Search a Major Cleanup; Promises Better App Discovery, Less Cluttered UI
  7. Apple’s Lawsuit Claims OpenAI Hired Over 400 Former Employees, Could Disrupt AI Firm's Plans to Launch Consumer Hardware
  8. AI Could Drive Mass Job Displacement and Transform Economies, Economists and 16 Nobel Laureates Warn
  9. Redmi 17C 5G Visits Geekbench With What Appears to Be the Same Hardware as the Redmi 15C 5G
  10. iOS 27 Public Beta Now Available for Eligible iPhone Models With Siri AI, Liquid Glass Upgrades: How to Install
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.