NASA Artemis I SLS Rocket Passes Fueling Test Ahead of Planned September 27 Launch Date: Details

NASA engineers were able to get a small hydrogen leak under control during the fuelling test, according to the US space agency.

Advertisement
By Agence France-Presse | Updated: 22 September 2022 11:43 IST
Highlights
  • Artemis 2 would take astronauts to Moon without landing on its surface
  • NASA has set October 2 as a backup date
  • NASA wants to build a lunar space station called Gateway

NASA is targeting a September 27 launch date for its Artemis I mission

Photo Credit: Twitter/ @NASAArtemis

NASA said Wednesday it had successfully trialed the fuelling process for its new rocket, after technical issues a few weeks ago halted two attempts to get the behemoth off the ground and headed towards the Moon.

"All of the objectives that we set out to do we were able to accomplish today," said Charlie Blackwell-Thompson, launch director of the program called Artemis 1.

Advertisement

The unmanned mission hopes to test the new 30-story SLS rocket as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

The last attempt in early September to launch NASA's most powerful rocket yet had to be aborted because of a leak while its cryogenic fuels — liquid hydrogen and oxygen — were being pumped into the rocket's tanks.

Advertisement

Repairs were carried out and Wednesday's test involved filling those tanks again.

Though a small hydrogen leak was detected during the test, NASA engineers were able to get it under control.

Advertisement

Last week NASA said it is now aiming for September 27 as the next date for liftoff. October 2 was set as a backup date.

"Teams will evaluate the data from the test, along with weather and other factors, before confirming readiness to proceed into the next launch opportunity," NASA said.

Advertisement

Asked about the timing of the next launch attempt, Blackwell-Thompson declined to comment, though she said she was "extremely encouraged by the test today."

US officials are also keeping a close eye on Hurricane Fiona's trajectory off the coast in the Atlantic.

For the September 27 date to be possible, NASA must receive a waiver to avoid retesting the batteries on a detonation system used to destroy the rocket if it strays uncontrollably off course.

The next mission, Artemis 2, would take astronauts to the Moon without landing on its surface, while the third — set for the mid-2020s — would see the first woman and person of colour on lunar soil.

NASA wants to build a lunar space station called Gateway and keep a sustained presence on the Moon to gain insight into how to survive very long space missions, ahead of a mission to Mars in the 2030s.


Buying an affordable 5G smartphone today usually means you will end up paying a "5G tax". What does that mean for those looking to get access to 5G networks as soon as they launch? Find out on this week's episode. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Artemis 1
Advertisement

Related Stories

Popular Mobile Brands
  1. Redmi Note 15 SE 5G Roundup: Here's Everything That We Know So Far
  2. Oppo K15 Pro Series With Active Cooling Fan Launched: See Price
  3. Iran Conflict Reportedly Exposes India's Smartphone Exports to Risks
  4. Lava Bold N2 Lite Arrives With a 5,000mAh Battery at This Price in India
  5. Google Finally Lets Users Change Their Gmail Address
  6. Gadgets360 Awards 2026: Check Out Winners of India's Most Trusted Awards
  1. Crimson Desert Has Sold 4 Million Copies, Pearl Abyss Announces
  2. Axis Bank Introduces Aadhaar Face Authentication: How to Update Your Axis Bank Mobile Number
  3. Meghalaya Government Signs MoU With Starlink to Boost Connectivity in Region and Reduce Digital Divide
  4. Samsung Galaxy A27 5G Visits Geekbench With Older Snapdragon 6 Gen 3 Chip, 6GB RAM
  5. Interactive Brokers Expands Crypto Trading to Retail Investors in Europe
  6. Blinkit Launches Inside Mumbai Airport, Lets Users Order Essentials From Across the Terminal
  7. Smartphone Exports From India Could See a Notable Decline as Iran Conflict Persists: Report
  8. Redmi A7 Pro Launched With 6,000mAh Battery, 13-Megapixel Rear Camera: Price, Features
  9. Gen Z Reportedly Dominates India’s Crypto Futures Market With 61 Percent Share
  10. Nvidia’s New DLSS 4.5 Update Brings AI-Powered 6X Multi-Frame Generation Feature
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.