Mars-2 Mission to Launch in 2018, Says Isro

Advertisement
By Indo-Asian News Service | Updated: 30 October 2014 16:10 IST
Riding on the recent success of its Mars Orbiter Mission (MOM), India plans to revisit the planet in 2018, possibly with a lander and rover to conduct more experiments, a space official said Wednesday.

"We plan to launch a second mission to Mars in 2018, probably with a lander and rover, to conduct more experiments for which we have to develop new technologies," Indian Space Research Organisation (Isro) satellite centre director S. Shiva Kumar told reporters in Bangalore.

The state-run space agency successfully inserted its spacecraft (MOM) September 24 in the Martian orbit with five scientific instruments to search for life-sustaining elements on the planet over nine months after it was launched November 5, 2013 from its spaceport at Sriharikota in Andhra Pradesh and about 90 km northeast of Chennai.

Advertisement

"We will be able to take the Mars-2 mission after launching the second mission to the moon (Chandrayaan-2) in 2016 with our own lander and rover, which will help us develop a separate lander and rover for the red planet," Kumar said, ahead of a three-day 'Engineers Conclave-2014' by the space agency with the Indian National Academy of Engineering in Bangalore.

As missions to Mars can be launched only at an interval of two years, the space agency is looking for a slot in 2018 and by which it hopes to have a heavy rocket fully operational to carry a lander and rover with scientific experiments as additional payloads.

Advertisement

"We hope to have fully operational heavy rockets over the next two-three years for carrying communication satellites weighting two-three tonnes into the geo-stationary orbits around the earth," Kumar said.

The space agency has developed the geo-synchronous satellite launch vehicle (GSLV-Mark I-III) with indigenous cryogenic engine to launch heavier satellites weighing more than two tonnes and three tonnes into the geo-orbit at 36,000 km above Earth.

Advertisement

"GSLV-Mark I-III will be used for Chandrayaan-2, which will have heavier payload than its predecessor (Chandrayaan-1) and later for Mars-2 mission, as both will have a lander and rover in addition to scientific experiments," he said.

The space agency launched January 5 a GSLV rocket with an indigenous cryogenic engine from the spaceport and placed a communication satellite (Gsat-14) in the geo-stationary orbit.

Advertisement

Chandrayaan-1 was launched October 22, 2008, using a polar satellite launch vehicle (PSLV-C11), a four-stage rocket.

The 475 kg Mars Orbiter was also launched onboard a polar rocket.

The GSLV-Mark III's maiden launch is likely to be in December.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus Pad 4 to Launch in India With a 13,380mAh Battery on This Date
  2. Oppo Find X10 Key Specifications Leak as Find X9 Ultra Launch Nears
  3. OnePlus Nord CE 6 Lite Appears on Geekbench With This MediaTek Chip
  4. Motorola Hikes Prices of These Tablets in India
  5. Best Mobiles Under Rs. 40,000 in India
  6. YouTuber Demonstrates Flaw That Allows Money to Be Stolen From Locked iPhone
  7. Lumio Introduces Vision 9 (2026) and Vision 7 (2026) TVs in India
  1. OnePlus Nord CE 6 Lite Appears on Geekbench With Dimensity 7400 Chip, Android 16
  2. Meta’s Planned Facial Recognition Feature for Smart Glasses Faces Opposition From Privacy Orgs
  3. Vivo X300 Ultra Pricing Surfaces Online via Retail Listing in Europe
  4. YouTube's New Option Lets Users Effectively Turn Off Shorts From Their Feed
  5. South Korea Plans Blockchain-Based Payments for Government Spending
  6. Amazon Launches AI Store to Help Users Discover and Shop AI-Powered Devices
  7. Motorola Razr Fold, Lenovo Legion Y70 to Launch Alongside Y900 Tablet During Lenovo's May 19 Event
  8. Apple Tap-to-Pay Vulnerability Demonstrated on Video as YouTuber Steals $10,000 From a Locked iPhone
  9. Adobe’s New Firefly AI Assistant Can Perform Complex Design Tasks With Text Prompts
  10. Crimson Desert Has Sold Over 5 Million Copies, Pearl Abyss Confirms
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.