James Webb Space Telescope Conducts Critical Tower Extension, Sun Shield Deployment in Next Few Days

James Webb Space Telescope will still take nearly six months to get fully ready to do its job.

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 30 December 2021 12:51 IST
Highlights
  • James Webb Space Telescope was launched on Christmas Day
  • James Webb Space Telescope can only be unfolded when it's in orbit
  • James Webb Space Telescope is the largest of its kind

James Webb Space Telescope has successfully completed its Deployable Tower Assembly

Photo Credit: Twitter/ @NASAWebb

NASA's James Webb Telescope is going through some critical manoeuvre phases which will determine its success as a mission to shed light on the origin of the universe. The powerful space observatory, which was launched into orbit on Christmas Day, is heading for a “make or break” moment when it attempts to unpack its five-layered sun shield. The barrier will provide the space telescope with super cold temperatures for its instruments to work properly. And NASA is providing regular updates via Twitter on these tense moments, which are being followed by millions of enthusiasts around the world.

In a tweet, NASA said the James Webb team has successfully extended the Deployable Tower Assembly (DTA) in order to unfold the sun shield in the next few days. The launch of the space telescope from Earth was only the start of a six-month process to get James Webb into place for its job. The process is lengthy, as James Webb Space Telescope is a big observatory, packed into a tiny space inside the nose cone of the Ariane launcher. What this means is that the telescope could only be unfolded once it was released into orbit.

The deployment of DTA creates space between the upper section of the observatory and the spacecraft bus to allow sensitive mirrors and instruments to cool down to necessary temperatures to detect infrared light. This gap will also provide room for the sun shield membranes, each as thin as human hair, to fully unfold.

Advertisement

There's little room for error.

James Webb Space Telescope "is split into a ‘hot side' and ‘cold side' by its sun shield. The sun shield will always be facing the Sun to block out heat and light, as Webb's mirrors need to stay extremely cold to observe faint heat signals in the universe,” NASA explained in another tweet.

Advertisement

Why the need for this hot and cold separation? Temperatures on the hot side of James Webb will reach as high as 85 degrees Celsius and on the cold side it will be about -233 degrees Celsius. If you are intrigued by such a huge temperature difference, NASA has set up a live tracker. “Note that temperatures will continue to change as Webb unfolds and then cools down to operating temperatures over the next months,” the agency added.

NASA said that the James Webb team has successfully completed two mid-course corrections that will significantly enhance the life of the observatory.

Advertisement

James Webb, meanwhile, has automatically executed the solar array deployment after rocket separation. “Because Webb was already in the correct attitude, the array deployed about 1.5 min after separation, or 29 min. after launch,” the agency added.

The James Webb Space Telescope is a joint project of the NASA, European Space Agency, and the Canadian Space Agency.


How does the Oppo Find N improve over Galaxy Z Fold 3? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. ACT Fibernet Launches New Broadband Plans With Free OTT Subscriptions
  2. Flipkart Buy Buy 2025 Sale: Nothing Phone 3, Phone 3a Deals Revealed
  3. HMD 101, HMD 100 With Built-In Radio Launched in India at These Prices
  4. Flipkart Buy Buy 2025 Sale With Discounts on iPhone 16 Begins on This Date
  5. OnePlus 15R Surfaces on Benchmarking Site Ahead of India Launch
  6. Motorola Edge 70 With Pantone's 2026 Colour, Swarovski Crystals Launched
  7. Nothing Phone 3a Lite Goes on Sale in India at This Price
  8. FaceTime, Snapchat Video Calls Have Reportedly Been Blocked in Russia
  9. Airtel Discontinues These Prepaid Recharge Packs in India
  10. Realme Watch 5 Launched in India With Up to 16-Day Battery Life: See Price
  1. Airtel Discontinues Two Prepaid Recharge Packs in India With Data Benefits, Free Airtel Xtreme Play Subscription
  2. Samsung Galaxy Phones, Devices Are Now Available via Instamart With 10-Minute Instant Delivery
  3. NotebookLM App Gets an In-Built Camera, Lets Users Upload Images as a Source
  4. HMD 101 Launched in India With 1,000mAh Battery, Auto Call Recording Alongside HMD 100: Price, Features
  5. Crypto Traders Await US Fed Signals as Bitcoin Price Drops to $91,900
  6. Nothing Phone 3a Lite Goes on Sale in India: See Price, Offers, Availability
  7. Realme Narzo Phones Confirmed to Launch in India Soon via Amazon
  8. Samsung Galaxy Watch Ultra 2 Launch Timeline Leaked; Could Debut Alongside Samsung Galaxy Watch 9
  9. Samsung Galaxy S26 Series May Get Exynos 2600 Chipset Exclusively in South Korea: Report
  10. Apple’s FaceTime Reportedly Blocked in Russia Alongside Snapchat’s Video Calling Feature
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.