NASA Plans for Return to Moon to Cost $28 Billion

NASA administrator Jim Bridenstine noted that "political risks" were often the biggest threat to NASA's work, especially before a crucial election.

Advertisement
By Agence France-Presse | Updated: 22 September 2020 10:45 IST
Highlights
  • Barack Obama cancelled plans for a manned Mars mission
  • Artemis II will take astronauts around the Moon but will not land
  • Artemis III will be the equivalent of Apollo 11 in 1969

The first flight, Artemis I, scheduled for November of 2021, will be unmanned

Photo Credit: NASA

NASA on Monday revealed its latest plan to return astronauts to the Moon in 2024, and estimated the cost of meeting that deadline at $28 billion (roughly Rs. 2,05,787 crores), $16 billion (roughly Rs. 1,17,592 crores) of which would be spent on the lunar landing module.

Congress, which faces elections on November 3, will have to sign off on the financing for a project that has been set by President Donald Trump as a top priority. The $28 billion (roughly Rs. 2,05,787 crores) would cover the budgetary years of 2021-25. 

In a phone briefing with journalists Monday on the Artemis mission to return human beings to the Moon, NASA administrator Jim Bridenstine noted that "political risks" were often the biggest threat to NASA's work, especially before such a crucial election.

Advertisement

Barack Obama cancelled plans for a manned Mars mission, after his predecessor spent billions of dollars on the project.

Advertisement

If Congress approves the first tranche of $3.2 billion (roughly Rs. 23,515 crores) by Christmas, "we're still on track for a 2024 moon landing," Bridenstine said.

"To be clear, we're going to the South Pole," he said, ruling out the sites of the Apollo landings on the Moon's equator between 1969 and 1972. "There's no discussion of anything other than that."

Advertisement

Three different projects are in competition to build the lunar lander that will carry two astronauts, one of them a woman, to the Moon from their vessel Orion.

The first one is being developed by Blue Origin, founded by Amazon CEO Jeff Bezos, in partnership with Lockheed Martin, Northrop Grumman and Draper. The other two projects are being undertaken by Elon Musk's SpaceX and by the company Dynetics.

Advertisement

The first flight, Artemis I, scheduled for November of 2021, will be unmanned: the new giant rocket SLS, currently in its test phase, will take off for the first time with the Orion capsule.  

Artemis II, in 2023, will take astronauts around the Moon but will not land.

Finally, Artemis III will be the equivalent of Apollo 11 in 1969, but the stay on the Moon will last longer, for a week, and will include two to five "extravehicular activities." 

"The science that we would be doing is really very different than anything we've done before," said Bridenstine. "We have to remember during the Apollo era, we thought the moon was bone dry. Now we know that there's lots of water ice and we know that it's at the South Pole."


Are Apple Watch SE, iPad 8th Gen the Perfect ‘Affordable' Products for India? We discussed this on Orbital, our weekly technology podcast, which you can subscribe to via Apple Podcasts, Google Podcasts, or RSS, download the episode, or just hit the play button below.

Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Samsung Galaxy S26 Series Specifications Leaked in Full
  2. Lava Agni 4 Teased With Dual Rear Camera System Ahead of Launch
  1. Lava Agni 4 Teased to Come With Dual Rear Camera System; Certification Site Listing Reveals Battery Specifications
  2. Microsoft Announces Latest Windows 11 Insider Preview Build With Ask Copilot in Taskbar, Shared Audio Feature
  3. Samsung Galaxy S26 Series Specifications Leaked in Full; Major Camera Upgrades Tipped
  4. iPhone 18 Pro Tipped to Launch in Burgundy, Coffee, and Other New Colour Options
  5. SpaceX Revises Artemis III Moon Mission with Simplified Starship Design
  6. Rare ‘Second-Generation’ Black Holes Detected, Proving Einstein Right Again
  7. Starlink Hiring for Payments, Tax and Accounting Roles in Bengaluru as Firm Prepares for Launch in India
  8. Google's 'Min Mode' for Always-on Display Mode Spotted in Development on Android 17: Report
  9. OpenAI Upgrades Sora App With Character Cameos, Video Stitching and Leaderboard
  10. Samsung's AI-Powered Priority Notifications Spotted in New One UI 8.5 Leak
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.