NASA Suspends Work on Artemis Manned Mission Moon Rocket Due to Coronavirus

NASA is shutting down its Michoud Assembly Facility in New Orleans, where the Space Launch System rocket is being built.

Advertisement
By Agence France-Presse | Updated: 20 March 2020 17:31 IST
Highlights
  • The virus outbreak could hit US plans to return to the Moon by 2024
  • The space agency is shutting down its Michoud Assembly Facility
  • NASA and contractors teams will complete an orderly shutdown

NASA temporarily suspends production and testing of Space Launch System and Orion hardware

NASA said it has suspended work on building and testing the rocket and capsule for its Artemis manned mission to the Moon due to the rising number of coronavirus cases in the community.

The space agency is shutting down its Michoud Assembly Facility in New Orleans, where the Space Launch System rocket is being built, and the nearby Stennis Space Center, administrator Jim Bridenstine said late Thursday.

Advertisement

"The change at Stennis was made due to the rising number of COVID-19 cases in the community around the center, the number of self-isolation cases within our workforce there, and one confirmed case among our Stennis team," he said.

"NASA will temporarily suspend production and testing of Space Launch System and Orion hardware. The NASA and contractors teams will complete an orderly shutdown that puts all hardware in a safe condition until work can resume."

The Space Launch System is a powerful deep space rocket to transport astronauts to the Moon and beyond while Orion is the crew module.

The virus outbreak could hit US plans to return to the Moon by 2024.

Advertisement

"We realize there will be impacts to NASA missions, but as our teams work to analyze the full picture and reduce risks we understand that our top priority is the health and safety of the NASA workforce," Bridenstine said.

A manned return to the Moon is the first part of the Artemis program to set up a long-term colony and test technologies for a crewed mission to Mars in the 2030s.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, coronavirus
Advertisement

Related Stories

Popular Mobile Brands
  1. HMD 2660 Flip Senior Edition Launched With AI Companion Mary, 4G Support
  2. Oppo Pad Mini Launched in India With These Features
  3. Redmi Book 2027 Series Launch Date Announced
  1. Meta Ordered to Pay $25 Billion Penalty in Data Privacy Case
  2. Oppo Enco X4 TWS Earbuds Launched in India With Hi-Res Audio, Up to 53 Hours of Total Battery Life
  3. Cyberpunk 2077 Gets New Quests, Gameplay Features and Mod Support With Edgerunners 2 Update
  4. CoinDCX Dismisses Second Breach Claims as Blockchain Investigators Examine Wallet Transfers
  5. HMD 2660 Flip Senior Edition Launched With AI Companion Mary, Removable Battery, 4G Support: Price, Features
  6. Lenovo Yoga Pro 9n, Yoga 9n 2-in-1 With Nvidia RTX Spark Launched in India: Price, Specifications
  7. Oppo Pad Mini Launched in India With 2.5K OLED Screen, 8,000mAh Battery: Price, Specifications
  8. Oppo Find X10 Pro Max Launched in India With Triple 200-Megapixel Cameras, Dimensity 9600 Pro SoC, Oppo Find X10 Tags Along: Price
  9. Google Cloud Adds GPT-6 Astra, GPT-6.1 Sol, GPT-6 Luna Models to Model Garden
  10. China Demands Return of 61,800 BTC Seized in UK Fraud Investigation
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.