'Fundamental flaws' in DoT's rejection, says Vodafone

Advertisement
By Press Trust of India | Updated: 1 April 2013 16:03 IST
Holding that the company never sought extension of its licences for free, Vodafone India has said rejection by the Department of Telecom (DoT) suffered from "several fundamental flaws, contradictions and jurisdictional errors".

DoT has rejected the demand of Vodafone India for licence extension in three circles on March 21 and asked the mobile operator to bid for airwaves to continue their services there.

DoT has said that in clause related to extension of licences, companies should not read 'may' as 'shall' extend licence.

Advertisement

"The said rejection suffers from several fundamental flaws, contradictions, jurisdictional errors and errors apparent on the face of the record, which have rendered the said rejection legally unsustainable," Vodafone India resident director (regulatory affairs and government relations) TV Ramachandran said in a letter to DoT.

Vodafone India had sought extension of its licence period for Delhi, Mumbai and Kolkata circles, which were coming up for renewal in November 2014 under Clause 4.1 of the licence agreement under which the government can extend the period of licence by ten years at one go if the request is made by the operator during the 19th year of the licence period.

Advertisement

Claiming that DoT rejected its application on the ground that it has not come to settle "new" terms and conditions, it said no terms and conditions have been provided by the department to the company.

"While you state that consideration for extension is subject to new terms and conditions, no such terms have been provided, thus demonstrating that DoT has not even considered as contemplated in Clause 4.1 of our licence," the letter said.

Advertisement

The company said DoT has "misinterpreted National Telecom Policy (NTP) 2012 and wrongly applied provisions of NTP stating that spectrum and licenses are already de-linked".

Vodafone said DoT "misinterpreted and misconstrued Clause 4.1" of its licence by stating that its licences are fixed for a fixed period of 20 years.

Advertisement

"You have adopted self-contradictory and inconsistent stands on the same issue as on one hand you have stated in the letter that spectrum can also be allocated through market related process but on the other hand stated that unless we participate in the auction and get the bid confirmed, we would not be entitled to the spectrum," it said.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Here's When the Motorola Edge 70 Pro+ Will Launch in India
  2. Vivo Y600 Turbo Launched With 9,000mAh Battery at This Price
  3. Xiaomi 17T, Xiaomi 17 Pro Price, Storage Variants Leak Ahead of Launch
  1. Apple's iOS 27 Update Said to Offer Revamped AirPods Settings Interface With Simplified Controls Layout
  2. Epic Games Unveils Unreal Engine 6 Along With 'New Era' of Rocket League
  3. Vivo S60 Geekbench Listing Reveals Key Specifications Including Snapdragon 8s Gen 3 Chip, 16GB RAM
  4. Who's Your Gynac? Season 2 Now Streaming Online: What You Need to Know
  5. OnePlus Pad Model With Compact OLED Display to Launch in India Soon, Tipster Claims
  6. Vivo Y600 Turbo Launched With 9,000mAh Battery, Snapdragon 7s Gen 4 SoC: Price, Specifications
  7. Apple's AI-Powered Health Coach Said to Face Delay, Might Arrive After watchOS 27 Release
  8. Motorola Edge 70 Pro+ India Launch Date Announced; Periscope Telephoto Rear Camera Confirmed
  9. Xiaomi 17T, Xiaomi 17 Pro Price, Storage Configurations Leak Ahead of Global Launch
  10. Xiaomi Smart Band 11 Active Reportedly Sighted on IMDA, NCC Certification Sites Ahead of Launch
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.