NASA Says Artemis I Wet Dress Rehearsal Delayed Again, Likely Now in Mid-March

NASA is testing the most powerful rocket ever built for the Artemis mission.

Advertisement
By Edited by Gadgets 360 Newsdesk | Updated: 4 February 2022 11:31 IST
Highlights
  • Space Launch System (SLS) rocket will be used for Artemis mission
  • SLS is the most powerful rocket ever built
  • NASA said its taking time to be careful during tests before launch

NASA's Artemis mission aims to take humans back to the Moon

NASA has again delayed the final prelaunch test of Artemis I, an uncrewed mission that will be the stepping stone for returning humans to the Moon after several decades. The wet dress rehearsal was previously scheduled for February and has now been postponed to mid-March. This could now delay the actual launch of Artemis I to April or May. The agency said this delay is a result of the additional time needed to complete “closeout activities” inside the Vehicle Assembly Building (VAB) at the Kennedy Space Center in Florida, US, as the rocket will be rolled out in the open for the first time.

NASA is testing the most powerful rocket ever built for the Artemis mission. The rocket, called the Space Launch System (SLS), will be topped by an Orion spacecraft. Together, they stand tall at 322 feet. The wet rehearsal will verify the system for the final time before the actual launch. It includes running the full set of operations until the launch countdown without actually launching the rocket. If all parameters are deemed okay, the system will head back into the VAB and wait for the actual launch.

The US space agency said in a statement that it will roll the combined rocket and spacecraft out of the VAB for testing “no earlier than March 2022”. “While the teams are not working on any major issues, NASA has added additional time to complete closeout activities inside the VAB prior to rolling the rocket out for the first time,” it added.

Advertisement

Tom Whitmeyer, the deputy associate administrator for exploration systems development at NASA, said that the team is taking time to be careful. “This is the part where we're closing things out and getting ready to launch, and there's a lot of activities associated with that," Whitmeyer told CNN.

In October last year, NASA had announced that it was targeting a mid-February to launch Artemis I, which was originally scheduled to take off in November 2021. It had provided two additional launch opportunities then — March 12-27 and April 8-23.

Advertisement


Why is 5G taking so long? We discuss this on Orbital, the Gadgets 360 podcast. Orbital is available on Spotify, Gaana, JioSaavn, Google Podcasts, Apple Podcasts, Amazon Music and wherever you get your podcasts.
Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Motorola Edge 70 Ultra Camera Configuration, Other Key Features Leaked
  2. Nothing Phone 4a Series Price and Key Specs Tipped
  3. Realme Narzo 90 Series Price in India Leaked; Will Come in These Colourways
  4. Dominic and the Ladies' Purse OTT Release Date: When and Where to Watch it Online?
  5. Star's Wobble Around Black Hole Confirms Einstein's Century-Old Prediction
  6. Hogwarts Legacy Is Currently Free on Epic Games Store: How to Redeem
  7. The Rookie Season 7 OTT Release Date: When and Where to Watch it Online?
  8. Galaxy Mergers Can Switch On Supermassive Black Holes, Euclid Finds
  1. Astronomers Observe Star’s Wobbling Orbit, Confirming Einstein’s Frame-Dragging
  2. Galaxy Collisions Found to Activate Supermassive Black Holes, Euclid Data Shows
  3. JWST Detects Oldest Supernova Ever Seen, Linked to GRB 250314A
  4. Chandra’s New X-Ray Mapping Exposes the Invisible Engines Powering Galaxy Clusters
  5. Blue Origin to Fly First Wheelchair User to Space on New Shepard NS-37
  6. Chandra’s New X-Ray Mapping Exposes the Invisible Engines Powering Galaxy Clusters
  7. Sasivadane Now Streaming on Amazon Prime Video: Everything You Need to Know
  8. Kuttram Purindhavan Now Streaming Online: What You Need to Know?
  9. Lyne Lancer 19 Pro With 2.01-Inch Display, SpO2 Monitoring Launched in India
  10. OpenAI and Disney Reach Licensing Agreement to Bring Its Characters to the Sora App
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.