NASA’s Halted Rocket Test Could Stall Moon Shot, Redo Possible

NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage.

Advertisement
By Assoicated Press | Updated: 20 January 2021 12:05 IST
Highlights
  • NASA said it can adjust test limits if a second test is deemed necessary
  • Two other engine-related issues also occurred
  • Artemis programme is working to put astronauts back on Moon by 2024

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect core stage

Photo Credit: Twitter/ @NASA

NASA is considering a second firing of its Moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing programme into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the Moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday's aborted test.

“We have a shot at flying it this year, but we need to get through this next step," said Kathy Lueders, head of NASA's human spaceflight office.

Advertisement

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA's Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-metre) core stage — made by Boeing — included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

Advertisement

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyse the data, as managers debate the pros and cons of proceeding with a second test firing at Stennis or shipping the rocket straight to Florida's Kennedy Space Center for launch preparations. Some of that Kennedy work might be able to be streamlined, Lueders said.

Advertisement

This core stage can be loaded with super-cold fuel no more than nine times, NASA Administrator Jim Bridenstine told reporters Tuesday evening. A second full-blown test firing would reduce the remaining number of fill-ups.

The Artemis programme is working to put astronauts back on the Moon by 2024, a deadline set by the Trump administration. It's uncertain how the incoming White House will approach that timeline.

Advertisement

In its annual report Tuesday, the Aereospace Safety Advisory Panel urged NASA to develop a realistic schedule for its Artemis Moon programme and called into question the 2024 date for returning astronauts to the lunar surface.

On the eve of his departure from NASA, Bridenstine, a former Republican congressman from Oklahoma, stressed that key programmes like Artemis need to encompass multiple administrations, decades and even generations. It's crucial , he said, that "we've got buy-in and support from all of America and members of Congress on both sides of the aisle.”


Does WhatsApp's new privacy policy spell the end for your privacy? We discussed this on Orbital, our weekly technology podcast, which you can subscribe to via Apple Podcasts, Google Podcasts, or RSS, download the episode, or just hit the play button below.

Affiliate links may be automatically generated - see our ethics statement for details.
 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who'sThat360 on Instagram and YouTube.

Further reading: NASA, Moon, Artemis, Space Launch System
Advertisement

Related Stories

Popular Mobile Brands
  1. Amazon Great Indian Festival 2025 Sale Will Begin on This Date
  2. Top OTT Releases of the Week (Sept 1 - Sept 7): Know What to Watch
  3. Flipkart Big Billion Days Sale Date Revealed, Will Compete With Amazon Sale
  4. Vivo X300 Pro Might Not Arrive With Faster Charging Support
  5. Samsung Galaxy S25 FE Launched With Exynos 2400 SoC: See Price
  6. Samsung Launches Galaxy Tab S11 Series With Galaxy AI, These Features
  7. Oppo Reno 14 FS 5G Launches in Select Global Markets With These Features
  8. WhatsApp Could Implement iOS 26's Liquid Glass Across its iPhone App
  9. Huawei Mate XTs Triple Folding Smartphone With Kirin 9020 Chipset Launched
  10. OpenAI Said to Launch Its First AI Chip in 2026 With Broadcom
  1. Hollow Knight: Silksong's Massive Launch Crashes Steam, PlayStation, Xbox and Nintendo Storefronts
  2. Amazon Great Indian Festival 2025: Deals on Samsung Galaxy S24 Ultra, iPhone 15, OnePlus 13s Teased Ahead of Sale
  3. Adobe Premiere App for iOS Introduced With Desktop-Like Controls, Generative AI Tools
  4. Motorola G06 to Reportedly Debut With MediaTek Helio G81 Extreme SoC; Check Expected Price, Features
  5. Samsung Galaxy S26 Series Leaked Dummy Images Hint at iPhone-Inspired Design
  6. OpenAI Said to Launch Its First AI Chip in 2026 With Broadcom
  7. Japan’s Financial Services Agency Mulls Crypto Regulation Under FIEA
  8. WhatsApp for iPhone Testing Implementation of Apple’s iOS 26 Liquid Glass in Beta App
  9. iPhone 17 Series Predicted to Outsell iPhone 16 Models With RAM Upgrades, Improved Cameras, and More
  10. ISRO Tests Parachutes for Gaganyaan Crew Module in Key Rocket-Sled Trial
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2025. All rights reserved.