NASA’s Halted Rocket Test Could Stall Moon Shot, Redo Possible

NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage.

Advertisement
By Assoicated Press | Updated: 20 January 2021 12:05 IST
Highlights
  • NASA said it can adjust test limits if a second test is deemed necessary
  • Two other engine-related issues also occurred
  • Artemis programme is working to put astronauts back on Moon by 2024

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect core stage

Photo Credit: Twitter/ @NASA

NASA is considering a second firing of its Moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing programme into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the Moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday's aborted test.

Advertisement

“We have a shot at flying it this year, but we need to get through this next step," said Kathy Lueders, head of NASA's human spaceflight office.

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA's Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-metre) core stage — made by Boeing — included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

Advertisement

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyse the data, as managers debate the pros and cons of proceeding with a second test firing at Stennis or shipping the rocket straight to Florida's Kennedy Space Center for launch preparations. Some of that Kennedy work might be able to be streamlined, Lueders said.

Advertisement

This core stage can be loaded with super-cold fuel no more than nine times, NASA Administrator Jim Bridenstine told reporters Tuesday evening. A second full-blown test firing would reduce the remaining number of fill-ups.

The Artemis programme is working to put astronauts back on the Moon by 2024, a deadline set by the Trump administration. It's uncertain how the incoming White House will approach that timeline.

Advertisement

In its annual report Tuesday, the Aereospace Safety Advisory Panel urged NASA to develop a realistic schedule for its Artemis Moon programme and called into question the 2024 date for returning astronauts to the lunar surface.

On the eve of his departure from NASA, Bridenstine, a former Republican congressman from Oklahoma, stressed that key programmes like Artemis need to encompass multiple administrations, decades and even generations. It's crucial , he said, that "we've got buy-in and support from all of America and members of Congress on both sides of the aisle.”


Does WhatsApp's new privacy policy spell the end for your privacy? We discussed this on Orbital, our weekly technology podcast, which you can subscribe to via Apple Podcasts, Google Podcasts, or RSS, download the episode, or just hit the play button below.

Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Moon, Artemis, Space Launch System
Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus N6x Design, Colour Options Teased Ahead of India Launch
  2. Samsung Galaxy Z Fold 8 Ultra Could Cost More Than Expected, Listing Suggests
  3. Redmi Note 17 Pro Max Listed on NBTC Website Ahead of Imminent Launch
  4. These OnePlus Smartphones Could Receive the ColorOS 17 Update in India
  5. Tecno Camon 50 Ultra 5G Sale Begins in India Today
  1. Offline UPI Payments With NFC Support Could Launch in India Soon
  2. Samsung Galaxy S26 Ultra's Privacy Display Feature Gets a Major Upgrade in One UI 9 Beta
  3. OnePlus N6x Design, Colour Options Teased in New Marketing Material Ahead of Imminent Launch in India
  4. OnePlus 11, Nord 4, and Newer Models Tipped to Receive the Android 17-Based ColorOS 17 Update in India
  5. Redmi Note 17 Pro Max Appears on Thailand's NBTC Certification Database, Might Launch Soon
  6. Apple’s First Foldable iPhone Reportedly Appears in iOS 27 Beta Code With a Multi-Battery Setup
  7. X for Android App Undergoes Major Design Overhaul, Enhanced Performance and Reliability
  8. Samsung Galaxy Buds Able to Reportedly Skip Galaxy Unpacked Launch; Could Debut in October
  9. Dell Alienware 16X Aurora, Alienware 16 Area-51 and Alienware 18 Area-51 Launched in India: Price, Specifications
  10. Samsung Galaxy A55, Galaxy A35 One UI 9 Test Builds Reportedly Spotted Ahead of Android 17 Rollout
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.