NASA’s Halted Rocket Test Could Stall Moon Shot, Redo Possible

NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage.

Advertisement
By Assoicated Press | Updated: 20 January 2021 12:05 IST
Highlights
  • NASA said it can adjust test limits if a second test is deemed necessary
  • Two other engine-related issues also occurred
  • Artemis programme is working to put astronauts back on Moon by 2024

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect core stage

Photo Credit: Twitter/ @NASA

NASA is considering a second firing of its Moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing programme into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the Moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday's aborted test.

Advertisement

“We have a shot at flying it this year, but we need to get through this next step," said Kathy Lueders, head of NASA's human spaceflight office.

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA's Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-metre) core stage — made by Boeing — included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyse the data, as managers debate the pros and cons of proceeding with a second test firing at Stennis or shipping the rocket straight to Florida's Kennedy Space Center for launch preparations. Some of that Kennedy work might be able to be streamlined, Lueders said.

Advertisement

This core stage can be loaded with super-cold fuel no more than nine times, NASA Administrator Jim Bridenstine told reporters Tuesday evening. A second full-blown test firing would reduce the remaining number of fill-ups.

The Artemis programme is working to put astronauts back on the Moon by 2024, a deadline set by the Trump administration. It's uncertain how the incoming White House will approach that timeline.

Advertisement

In its annual report Tuesday, the Aereospace Safety Advisory Panel urged NASA to develop a realistic schedule for its Artemis Moon programme and called into question the 2024 date for returning astronauts to the lunar surface.

On the eve of his departure from NASA, Bridenstine, a former Republican congressman from Oklahoma, stressed that key programmes like Artemis need to encompass multiple administrations, decades and even generations. It's crucial , he said, that "we've got buy-in and support from all of America and members of Congress on both sides of the aisle.”

Advertisement


Does WhatsApp's new privacy policy spell the end for your privacy? We discussed this on Orbital, our weekly technology podcast, which you can subscribe to via Apple Podcasts, Google Podcasts, or RSS, download the episode, or just hit the play button below.

Affiliate links may be automatically generated - see our ethics statement for details.
 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Further reading: NASA, Moon, Artemis, Space Launch System
Advertisement

Related Stories

Popular Mobile Brands
  1. OnePlus 16 vs iQOO 16: Price and Specifications Compared
  2. Best Phones With Telephoto Cameras Under Rs. 40,000
  1. Samsung Galaxy F70 5G With 5,000mAh Battery, 50-Megapixel Camera Goes on Sale in India: Price, Offers
  2. Apple ‘Pro and Tell’ Event Set for Next Week; First MacBook With Touchscreen, New iPad Mini and More Expected to Launch
  3. Cysic Shuts Down Bridge After Attacker Illegally Creates 10 Million CYS Tokens
  4. JPM Coin Arrives on Ethereum as JPMorgan Expands Institutional Payments
  5. Vivo V80 FE Reportedly Spotted on BIS Certification Website, India Launch Seems Imminent
  6. Airtel’s New Recharges in India Announced: Rs. 185, Rs. 203 and Rs. 206 Voice-Only Plans Details
  7. Vivo X500 Ultra Leak Reveals Launch Timeline, Chipset, Display and Key Specifications
  8. iQOO Neo 12 Launch Date Announced; Design, Colour Options Teased
  9. Qubic Halts Chain as Attacker Exploits Weak Seeds to Drain 1,400 Wallets
  10. iPhone Duo Battery Capacity Revealed Days Before Foldable Goes on Sale
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.