NASA’s Halted Rocket Test Could Stall Moon Shot, Redo Possible

NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage.

Advertisement
By Assoicated Press | Updated: 20 January 2021 12:05 IST
Highlights
  • NASA said it can adjust test limits if a second test is deemed necessary
  • Two other engine-related issues also occurred
  • Artemis programme is working to put astronauts back on Moon by 2024

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect core stage

Photo Credit: Twitter/ @NASA

NASA is considering a second firing of its Moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing programme into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the Moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday's aborted test.

“We have a shot at flying it this year, but we need to get through this next step," said Kathy Lueders, head of NASA's human spaceflight office.

Advertisement

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA's Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-metre) core stage — made by Boeing — included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

Advertisement

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyse the data, as managers debate the pros and cons of proceeding with a second test firing at Stennis or shipping the rocket straight to Florida's Kennedy Space Center for launch preparations. Some of that Kennedy work might be able to be streamlined, Lueders said.

Advertisement

This core stage can be loaded with super-cold fuel no more than nine times, NASA Administrator Jim Bridenstine told reporters Tuesday evening. A second full-blown test firing would reduce the remaining number of fill-ups.

The Artemis programme is working to put astronauts back on the Moon by 2024, a deadline set by the Trump administration. It's uncertain how the incoming White House will approach that timeline.

Advertisement

In its annual report Tuesday, the Aereospace Safety Advisory Panel urged NASA to develop a realistic schedule for its Artemis Moon programme and called into question the 2024 date for returning astronauts to the lunar surface.

On the eve of his departure from NASA, Bridenstine, a former Republican congressman from Oklahoma, stressed that key programmes like Artemis need to encompass multiple administrations, decades and even generations. It's crucial , he said, that "we've got buy-in and support from all of America and members of Congress on both sides of the aisle.”


Does WhatsApp's new privacy policy spell the end for your privacy? We discussed this on Orbital, our weekly technology podcast, which you can subscribe to via Apple Podcasts, Google Podcasts, or RSS, download the episode, or just hit the play button below.

Affiliate links may be automatically generated - see our ethics statement for details.
 

Catch the latest from the Consumer Electronics Show on Gadgets 360, at our CES 2026 hub.

Further reading: NASA, Moon, Artemis, Space Launch System
Advertisement

Related Stories

Popular Mobile Brands
  1. Flipkart Sale Early Deals: iPhone 17 Price in India Drops Under Rs. 75,000
  2. Here Are the Top 10 Deals on Smartphones During the Upcoming Amazon Sale
  3. Flipkart Reveals Deals on Phones For its Upcoming Sale: See Offers
  4. OnePlus Mid-Size Performance Phone With 8,000mAh Battery Could Launch Soon
  5. Best Earbuds Under Rs 3,000 in India You Can Buy Right Now
  6. Apple Announces Creator Pro Bundle With Final Cut Pro, Logic Pro and More
  7. Realme Neo 8 Colour Options, RGB Design Teased Ahead of Launch
  8. Here Are Some of the Best Smartphones Available in India With AMOLED Displays
  9. Samsung Galaxy S26 Could Finally Get 45W Fast Charging Upgrade
  10. Nothing Phones Will Get More Expensive in 2026
  1. Dhandoraa Now Streaming on Prime Video: Know Everything About This Telugu Drama Film Online
  2. Samsung Galaxy S26 Leak: Base Model Could Finally Get 45W Fast Charging Upgrade
  3. Haier H5E Series 4K Smart Google TVs With Bezel-Less Design Launched in India: Price, Features
  4. Flipkart Republic Day Sale 2026: Deals on iPhone 16, Pixel 10, and More Phones Revealed
  5. Google’s Response to OpenAI’s Healthcare Push Is an Open Model With Medical Imaging Capability
  6. Bandook OTT Release Date: When and Where to Watch it Online?
  7. Shabad: Reet Aur Riwaaz OTT Release: When and Where to Watch it Online?
  8. Taskaree: The Smuggler’s Web Now Streaming Online: Know Where to Watch This Emraan Hashmi Starrer Series Online
  9. Apple Will Reportedly Maintain Control Over Gemini-Powered Siri’s Responses
  10. Resident Evil Village, Like a Dragon: Infinite Wealth Reportedly Coming to PS Plus Game Catalogue in January
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.