NASA Aims to Deploy Nuclear Reactor on Moon by 2030 for Strategic Power

NASA plans to install a 100-kW nuclear reactor on the Moon by 2030 to power a future base.

Advertisement
Written by Gadgets 360 Staff | Updated: 7 August 2025 22:30 IST
Highlights
  • NASA to place 100-kW reactor on Moon’s south pole by 2030
  • Reactor enables power during 2-week lunar nights, fuels exploration
  • Budget cuts challenge NASA’s aggressive lunar reactor timeline

NASA plans 100-kilowatt Moon reactor for 2030 lunar outpost

Photo Credit: NASA

NASA's interim leader Sean Duffy recently declared the U.S. space agency aims to place a 100-kilowatt nuclear reactor on the Moon by 2030 to provide energy for an eventual lunar outpost. Duffy describes this as a new moon race to establish the strategic foothold and keep a competitive advantage for the U.S. During a press conference titled "Unleashing American Drone Dominance" , he emphasised the importance of having dependable power on the lunar surface. NASA moved up its new crew-rushed lunar lander by a full year as the agency scrambles to seize key resources on the moon and lay the groundwork for deeper exploration at least four years away.

According to the press conference, for exploration and a long-term Moon base, reliable power is crucial. Solar panels fail during the Moon's two-week-long nights, so a nuclear reactor could supply continuous electricity even in darkness. It would be especially valuable at the south pole, where permanent shadows hide water-ice deposits. These ice reserves are essential for life support and fuel, so steady power there would expand mission capabilities. Strategically, deploying a reactor would help secure key territory.

China and Russia plan to build one by the mid-2030s, and U.S. officials warn the first country to do so could effectively claim that region, creating a de facto “keep-out zone”. Duffy even called the south pole the Moon's “best” spot—rich in ice and sunlight—and said America must “get there first and claim that for America”.

Advertisement

Challenges

The directive sets near-term milestones. NASA must appoint a lunar reactor program manager within 30 days and solicit industry proposals within 60 days. The aim is a flight-ready 100 kW reactor by roughly 2030.

Advertisement

However, the plan faces major hurdles. The 2026 budget would allocate about $350 million to jump-start lunar fission power (rising to $500 M by 2027), but also proposes deep cuts to overall NASA funding. Observers note this would be NASA's smallest budget in decades. Meanwhile, the agency is trimming science programs and even its workforce.

 

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Google Pixel 10a Will Go on Sale in India via This E-Commerce Platform
  2. Infinix Note 60 Pro Officially Teased; Check Out Colourways, Specifications
  3. Boat Chrome Iris Launched in India With Up to Five Days of Battery Life
  4. Here Are the Best Smartphones in India With Silicon-Carbon Batteries
  5. Samsung Galaxy F70e 5G With 6,000mAh Battery Launched in India: See Price
  6. Apple Said to Launch New iPad Models Soon With These Upgrades
  7. Poco X8 Pro Bags Another Certification, Hinting at Imminent Debut
  8. Here's When Apple's MacBook Pro With M5 Pro, M5 Max Chips Might Launch
  9. Huawei Pura X2 May Launch China as a Wide Folding Handset With This Screen
  10. Apple Testing Two Key Camera Upgrades for iPhone 18 Pro Models
  1. Dark Matter May Not Exist, Study Suggests Gravity Works Differently at Cosmic Scales
  2. NASA’s SPHEREx Spots Interstellar Comet Flaring With Gas and Organic Molecules
  3. Gujarat Exchanges Letter of Intent With Starlink for High-Speed Internet Connectivity
  4. Sony WF-1000XM6 Key Features Leaked Ahead of February 12 Launch Event
  5. Infinix Note 60 Pro Launch Teased; Design, Colourways, Key Specifications Revealed
  6. Apple Opens Applications for Swift Student Challenge 2026: Know Dates, Eligibility, Rewards
  7. Huawei Pura X2 Tipped to Launch in China With 7.69-Inch Wide Folding Screen
  8. Perplexity’s New Feature Compares Answers From Three Different AI Models
  9. Google Pixel 10a Flipkart Availability Confirmed After Company Announces Pre-Orders Date: Expected Specifications
  10. Telegram App for Android Gets Liquid Glass-Inspired Redesign With Bottom Navigation Bar
Gadgets 360 is available in
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.