Isro to Test Reusable Launch Vehicle in June

Advertisement
By Indo-Asian News Service | Updated: 25 April 2016 11:53 IST
Highlights
  • The winged vehicle, is on way to Sriharikota for the maiden flight test.
  • RLV-TD will be flown up to 70km before its re-entry into the atmosphere.
  • Isro has developed the two-stage-to-orbit RLV-TD to reduce cost.
India is set to flight test, in June, a home-grown reusable launch vehicle to demonstrate its capability to re-enter atmosphere and return to earth for more space missions, a top official said on Saturday.

"The winged vehicle, in the shape of an aircraft, is on way to Sriharikota for the maiden flight test in June from our spaceport there," Indian Space Research Organisation (Isro) chairman A.S. Kiran Kumar said at an Indian Air Force event Bengaluru.

Sriharikota in coastal Andhra Pradesh, is about 80km northeast of Chennai.

Advertisement

As the cost of access to space exploration and utilisation is expensive, the space agency has developed the two-stage-to-orbit reusable vehicle (RLV-TD) for reducing the cost of launching its future satellites.

It has completed various tests, including acoustics at the National Aerospace Laboratories (NAL) here to act as a flying test bed to evaluate its technologies such as hypersonic flight, autonomous landing, and powered cruise flight, using air-breathing propulsion.

Advertisement

"The vehicle will be flown up to 70 km and released for its re-entry into the atmosphere. It has to withstand the atmospheric pressure and heat friction while re-entering into the atmosphere," Kiran Kumar said at the ninth annual Air Chief Marshal L.M. Khatre lecture.

The space agency will develop the RLV technologies through hypersonic flight experiment, landing experiment, return flight experiment and scramjet propulsion experiment.

Advertisement

"As the prototype vehicle is one-sixth of the original size, it may not require our polar satellite launch vehicle (PSLV)," the Isro chief added.

The space agency is also working on the second version of the geosynchronous satellite launch vehicle (GSLV Mark-III) to carry four-tonne class satellites into the geostationary orbit, about 36,000 km above earth.

Advertisement

The first experimental flight of the heavy rocket was carried on December 18, 2014 to test its atmospheric phase.

 

Get your daily dose of tech news, reviews, and insights, in under 80 characters on Gadgets 360 Turbo. Connect with fellow tech lovers on our Forum. Follow us on X, Facebook, WhatsApp, Threads and Google News for instant updates. Catch all the action on our YouTube channel.

Advertisement

Related Stories

Popular Mobile Brands
  1. Asus ROG Zephyrus Duo, G14, G16, ProArt PZ14 Laptops Go on Sale in India
  2. Nothing Phone 4b Visits Geekbench With This Snapdragon Chip
  3. Redmi 17C Debuts With MediaTek Helio G81 Ultra Chip, 5,160mAh Battery
  4. Sony's New LYT-610 Sensor Promises Better Resolution, 4K 120fps Recording
  5. Bitcoin Slips Toward $62,000 Mark as US Stock Selloff Dampens Risk Appetite
  6. Samsonite's Latest Tracking Feature Is Designed to Help You Find Your Luggage
  7. Here's How Much the Upcoming Vivo X Fold 6 Might Cost
  8. Firefox Now Lets You Shake Your Android Phone to Summarise Websites
  9. Realme P4x Debuts With 8,000mAh Battery and 4G Connectivity
  1. Redmi K90 Ultra China Launch Date Announced; Company Reveals Chipset Details Days Ahead of Debut
  2. Bitcoin Slips Toward $62,000 Mark as US Tech Stock Selloff Dampens Risk Appetite
  3. Netflix Announces Unhinged, an Immersive Horror Game Starring Zoë Kravitz That You Can Play on Your TV
  4. Firefox Now Lets You Shake Your Android Phone to Summarise Websites
  5. Sony Announces LYT-610 CMOS Image Sensor With 64-Megapixel Resolution, 4K 120fps Video Recording
  6. Vivo X500 Pro Camera Specifications Tipped Again; Could Feature Dimensity 9600 Pro SoC, 85mm Periscope Lens
  7. Nothing Phone 4b Surfaces on Geekbench With Snapdragon 6 Gen 4 Chipset
  8. Lords of the Fallen 2 Delayed to 2027 to Allow for Further Polish, Avoid Busy Holiday Period
  9. Samsung Galaxy Watch 9 Appears Nearly Identical to Its Predecessor in Leaked Renders
  10. Redmi Note 17 Series Phone Leaks With 9,000mAh Battery, Snapdragon 6-Series Chip
Download Our Apps
Available in Hindi
© Copyright Red Pixels Ventures Limited 2026. All rights reserved.